Skip to main content

Major German road contract awarded

A major road contract has been awarded close to Hesse in Germany.
By MJ Woof September 2, 2020 Read time: 2 mins
STRABAG is one of the partners in a major project in Hesse, Germany – image © courtesy of STRABAG

The contract for a major road project in Germany has been awarded for the A49 highway. The work will be carried out under the PPP model and is located close to Hesse.

The project is a design-build-finance-operate-maintain contract for A49 highway between Fritzlar and Ohmtal interchange. This 62km deal will be handled jointly by STRABAG Großprojekte and LEONHARD WEISS to close the gap between Schwalmstadt and the Ohmtal interchange

The project has a value of over € 700 million. The deal is for the construction of a 31km long section of the A49 highway between Schwalmstadt and the Ohmtal interchange in northern and central Hesse. The PPP project also includes the design and proportionate financing as well as the maintenance and operation of the motorway over a distance of nearly 62km between the Fritzlar junction and the Ohmtal A5/A49 interchange.

The client is the Federal Republic of Germany, represented by the State of Hesse, represented by Deutsche Einheit Fernstraßenplanungs- und -bau (DEGES). The consortium A 49 Autobahngesellschaft has been established for the project and is held 50:50 between STRABAG Infrastrukturprojekt and Meridiam Investments SAS. The PPP contract is for a 30-year concession.

Financing has been provided by the KfW IPEX-Bank (Germany), the European Investment Bank (EIB), MEAG (Germany) and ČSOB (Czech Republic, part of the Belgian KBC Group). In all the project will cost around €1.3 billion.

“We are pleased about the renewed trust in our ability to successfully realise large infrastructure projects in public-private partnerships, something we are already demonstrating in Germany with the A8 and A5 motorways,” said Thomas Birtel, CEO of STRABAG.

The A49 between Fritzlar and the Ohmtal interchange is divided into four sections. The first section to the Neuental junction is already open to traffic. The second section to the Schwalmstadt junction is currently under construction by HessenMobil. Realisation of the new sections three and four, from Schwalmstadt over the Stadtallendorf-Nord junction to the Ohmtal interchange, should begin in September 2020. The contract includes upgrading the A5 along a 1.5km section at the Ohmtal intersection. The main construction works are scheduled for completion in the third quarter of 2024.

For more information on companies in this article

Related Content

  • Karlsruhe’s new road tunnel project
    December 13, 2016
    Construction will commence in April 2017 on a new road tunnel link in Karlsruhe. Austrian contractor STRABAG has an 84% stake in the consortium, which also includes Schleith, building the link. Civil design is being handled by Ed Züblin meanwhile. The new Kriegsstraße vehicle tunnel in Karlsruhe will carry two lanes of road traffic underground, while providing a surface connection for trams, pedestrians and cyclists. The tunnel construction forms part of the wider Kombilösung public transport infrastructure
  • Stockholm bypass contract awarded
    March 4, 2016
    The contract to build a new highway bypass and interchange in Stockholm has been awarded by the Swedish transport authority, Trafikverket. The work will be carried out by Züblin Scandinavia, the Swedish subsidiary of Ed Züblin, in partnership with STRABAG subsidiary STRABAG Sverige. The work involves building a 950m long section of highway, including a complex interchange and is worth some €76 million. The works being carried out by Züblin in the district of Akalla north of Stockholm include sheeting and sh
  • France mulls widening the A31 between Nancy and Thionville
    December 20, 2018
    France is considering a 115km project to enlarge the A31 motorway between Nancy and Thionville near the border with Luxembourg. This project is expected to cost between €1.4-1.6 billion and work will be divided into three sections. The A31 autoroute, also known as l'Autoroute de Lorraine-Bourgogne, runs from the border with Luxembourg to Beaune where it joins the A6. It serves the cities of Metz, Nancy and Dijon and is heavily used in the holiday season as it is a convenient route for those travelling
  • NCT survey shows Brazil’s roads improving
    November 17, 2014
    Brazil’s roads are improving, but more than 49,000km remain in a fair, bad or very bad state, according to the latest figures from the National Confederation of Transport. Nearly half of roads are considered fair or worse, down from three-quarters in the NCT’s last survey in 2004. The NCT represents around 124,000 cargo and passenger transportation businesses and more than 824,000 independent truck drivers. The survey took into account paving, road routes and signalling and found the 10 best roads in