Skip to main content

Legal challenge to Austria-Slovenia tunnel contract award

A legal challenge has now been launched against the tender award for the second tube for the Karawanks/Karavanke Tunnel project between Austria and Slovenia. The challenge has been launched by the two bidders that were unsuccessful for the project, Kolektor CPG and Euro-Asfalt. The 7.8km-long tunnel route runs under the Alpine Karawanks/Karavanke mountain range, connecting the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana.
August 23, 2018 Read time: 1 min

A legal challenge has now been launched against the tender award for the second tube for the Karawanks/Karavanke Tunnel project between Austria and Slovenia. The challenge has been launched by the two bidders that were unsuccessful for the project, Kolektor CPG and Euro-Asfalt. The 7.8km-long tunnel route runs under the Alpine Karawanks/Karavanke mountain range, connecting the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana.

Related Content

  • Birmingham tenders for $1.57 billion contract
    February 21, 2022
    The private finance initiative contract is one of the largest tendered by a local UK government.
  • LagoonHull still on the cards
    February 7, 2022
    A proposed major river development in Hull would include an immersed road tunnel to connect traffic arriving from Europe with the UK’s motorway network.
  • Last link in Vietnam’s North-South Expressway
    May 3, 2024
    The Chi Lang-Huu Nghi section is the last part of the 2,060km-long expressway that connects the southern Mekong Delta with the northern province of Lang Son, bordering China.
  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for