Skip to main content

Legal challenge to Austria-Slovenia tunnel contract award

A legal challenge has now been launched against the tender award for the second tube for the Karawanks/Karavanke Tunnel project between Austria and Slovenia. The challenge has been launched by the two bidders that were unsuccessful for the project, Kolektor CPG and Euro-Asfalt. The 7.8km-long tunnel route runs under the Alpine Karawanks/Karavanke mountain range, connecting the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana.
August 23, 2018 Read time: 1 min

A legal challenge has now been launched against the tender award for the second tube for the Karawanks/Karavanke Tunnel project between Austria and Slovenia. The challenge has been launched by the two bidders that were unsuccessful for the project, Kolektor CPG and Euro-Asfalt. The 7.8km-long tunnel route runs under the Alpine Karawanks/Karavanke mountain range, connecting the Austrian Autobahn A11 from Villach with the A2 highway, running across the border to the Slovenian cities of Kranj and Ljubljana.

Related Content

  • UK contracts awarded to CRL
    September 23, 2021
    UK contracts have been awarded to Concrete Repairs Limited
  • Work starting on second Chesapeake Tunnel project
    September 20, 2017
    Work is now starting on a major tunnel project in the US state of Virginia. Construction of a second tunnel connection for the Chesapeake Bay is expected to cost US$756million. The original Chesapeake Bay Tunnel and Bridge crossing opened to traffic in April 1964 and measures just over 37km long. Construction of a second parallel bridge was commenced in 1995 and opened to traffic in 1999. However the central tunnel link was not widened at that time and now carries more traffic than it was designed for, whil
  • Višňové Tunnel delays continue
    June 21, 2022
    What will be Slovakia’s longest tunnel at 7.5km is facing more technical issues, according to the contractor Skanska.
  • Colombia contract won by consortium
    July 28, 2015
    Colombia’s National Infrastructure Agency (ANI), has awarded a consortium led by Spanish construction firm, Sacyr, a contract for work on the Pasto to Rumichaca highway. The route lies near Colombia’s border with Ecuador. This project forms part of the second wave of 4G road concessions being awarded. A second carriageway will be built for 80km between Ipiales and Catumbuco, with six road intersections, 2.6km of tunnels and 1.5km of bridges, pontoons and viaducts. The SAC 4G consortium comprises Sacyr and H