Skip to main content

Interest strong for Colombia key tunnel project

Interest is strong in the project to complete Colombia’s key tunnel construction contract. In all 23 firms have shown interest in the package of works to complete the La Linea tunnel project, according to the Colombian national road institute (Invias). The Colombian Government is providing US$204.5 million to complete the project. The current target is for the tunnel to be completed by 2020, although the link was originally supposed to be ready for traffic in late 2016. Construction work on the link commenc
January 22, 2019 Read time: 2 mins
Interest is strong in the project to complete Colombia’s key tunnel construction contract. In all 23 firms have shown interest in the package of works to complete the La Linea tunnel project, according to the Colombian national road institute (2812 Invias). The Colombian Government is providing US$204.5 million to complete the project. The current target is for the tunnel to be completed by 2020, although the link was originally supposed to be ready for traffic in late 2016. Construction work on the link commenced in 2008 and when it finally opens to traffic the tunnel will be 8.6km in length, making it the longest road tunnel in Latin America. The project has been subject to a string of delays, with unforeseen geological challenges having hindered progress during the early stages, and financing shortcomings having posed problems later on.


The La Linea tunnel forms part of the Cruce de la Cordillera Central road link, which will connect Calarca in Quindio Department with Cajamarca in Tolima Department. The existing stretch of National Route 40 between the two towns is narrow and features numerous sharp curves as it passes through a mountain region. The road has a poor safety record, with a crash rate around four times higher than the average for Colombian roads, and is struggling to cope with the volume of traffic it handles. Upgrading the National Route 40 stretch will help boost capacity and safety, and also cut journey times for drivers. The project includes building 31 bridge and 25 tunnel sections, three interchanges and 18km of dual carriageway.

For more information on companies in this article

Related Content

  • Colombia: New decree allows pension funds to finance 4G projects
    June 25, 2015
    Columbian president Juan Manuel Santos Colombia has said pension fund money could help finance the country’s ambitious 4G motorway projects. Columbia has 35 road projects underway costing more than US$11.7 billion, including the first two 4G tender waves with six public-private partnerships that have already been approved. During a banking convention held in the coastal city of Cartagena in mid-June, Banco Davivienda president Efrain Forero lending capacity studies have been completed for 4GH projects
  • Holiday traffic jams
    October 3, 2018
    In the Northern Hemisphere the summer means time for families to head off on holiday. At this time of year, many busy routes become jammed as holidaymakers head north, south, east or west, all in search of some rest and recreation. In the UK for example, the start of the school holiday period typically leads to families taking to the roads, with massive spikes in traffic volumes as a result. Some areas are particularly bad. The highway routes lying roughly between Munich in southern Germany and Milan in no
  • Legal step for Czech tunnel project
    April 23, 2014
    The torturous legal case regarding the stalled Blanka Tunnel project in the Czech Republic has taken one step forward. An arbitration court in the country has ruled that the tunnel has to be completed within five months' time. The construction work was halted earlier due to a dispute between the contractor and the city authorities. The tunnel is required to help reduce traffic congestion in the Czech capital Prague with work having commenced in 2007. The project was originally supposed to be ready for traff
  • US$2.1 billion Louisiana bridge deal for partners
    February 2, 2024
    A US$2.1 billion Louisiana bridge deal has been won by Sacyr, Acciona and Plenary Americas.