Skip to main content

Government to invest in second stage of the Mexico-Veracruz motorway

The Mexican Secretariat of Communications and Transport has allocated around US$615 million to complete construction of the second level of Mexico-Veracruz motorway. Works, which is ongoing along the 13.3km stretch, will be concluded by July 2016. The motorway will reinforce the connection between Veracruz port and the industrial areas of Puebla and Mexico states. Last month, the Secretariat confirmed that 80% of the projects included in the national infrastructure plan (PNI) between 2014 and 2018 are
August 4, 2015 Read time: 1 min
The Mexican Secretariat of Communications and Transport has allocated around US$615 million to complete construction of the second level of Mexico-Veracruz motorway.

Works, which is ongoing along the 13.3km stretch, will be concluded by July 2016. The motorway will reinforce the connection between Veracruz port and the industrial areas of Puebla and Mexico states.

Last month, the Secretariat confirmed that 80% of the projects included in the national infrastructure plan (PNI) between 2014 and 2018 are already under development. There are 52 major road infrastructure projects within the PNI. Of these, 17 of the new highways have been completed.

Related Content

  • Make the case for electronic tolling, ASECAP conference delegates heard
    September 14, 2015
    Mobility pricing and electronic tolling is the future, delegates to a recent ASECAP Study Days conference, reports Geoff Hadwick at the Lisbon event. The international road tolling industry is failing to make its case and the sector is losing out to other social and political lobby groups. As a result, “tolling is still on the sidelines”, according to the head of the Washington-based International Bridge, Tunnel and Turnpike Association. IBTTA chief executive Pat Jones issued his stark warning at the
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Key Argentina highway works planned
    March 2, 2017
    Argentina is planning two new highway projects to widen and improve key sections of Route 40 and Route 33. A US$291 million project will upgrade a stretch of the existing Route 40 to highway status. The two year project will see the widening of the road between Mendoza and San Juan and the construction work will start in the third quarter of 2017. Argentina’s Transport Ministry has said that the project will be funded by the Federal Government. A second stretch of Route 40 will also be widened and upgraded
  • Tunnel breakthrough for new Auckland link in New Zealand
    October 8, 2014
    Auckland’s Western Ring Route project update - Mary Bell writes. A number of integrated projects in Auckland, New Zealand, will improve the lot of road users and cyclists, and significantly alter the topography of the city’s motorway. On September 29th the tunnel boring machine digging the first of twin road tunnels beneath the city broke into daylight after 10 months underground. The new 2.4km-long Waterview tunnels will connect the city’s Northwestern and Southwestern motorways, each carrying three lane