Skip to main content

Four consortia head to second round Czech D4 tender

Czech Transport Ministry has advanced four out of seven consortia for a €975 million D4 motorway contract between Příbram to Písek. When signed, the 32km 25-year design-build-finance-operate contract will be the first of what the Czech government hopes will be more public-private partnerships. A Vinci-led consortium is one of the chosen groups, consisting of Vinci Highways, Vinci Concessiones and Meridiam Investments of France. Another is a German-Austrian group of Strabag and Hochtief. The third i
November 23, 2018 Read time: 2 mins
Private investment required: Czech Republic is nearing a decision for construction of a D4 section as part of a major push towards public-private partnerships

Czech Transport Ministry has advanced four out of seven consortia for a €975 million D4 motorway contract between Příbram to Písek.

When signed, the 32km 25-year design-build-finance-operate contract will be the first of what the Czech government hopes will be more public-private partnerships.

A 5177 Vinci-led consortium is one of the chosen groups, consisting of Vinci Highways, Vinci Concessiones and Meridiam Investments of France. Another is a German-Austrian group of Strabag and Hochtief.

The third is that of DIF Infra 5 Participations, Acciona Concessiones and John Laing Investments. The fourth is a consortium of  Porr, Obrascon Huarte, Egis Projects and 2378 Macquarie Corporate Holdings.

Negotiations with the four consortia will start at the beginning of next year  with the winner to start construction in 2020 and manage the motorway for 25 years.

The three rejected companies were FCC Conessiones of Spain, Pan-Mediterranean Engineering of Israel and IC Ictas Insaat Sanayi of Turkey.

Transport Minister Dan Ťok said his ministry will meanwhile move quickly as possible to obtain all essential rights of way for the D4 section route. He will also assess risks for the public and private sectors for when the ministry starts competitive dialogue with the eventual winner.
 
Tok also defended the use of PPP for the Příbram to Písek D4 work. "In the three-to-six year horizon, European funds for construction of motorways will be significantly reduced.

“Therefore, we need to prepare for other funding models, such as public-private partnerships. In the future, we would like to use this way in the sections where we have a complete zoning permits for the stretch of motorway of at least 30km. For example, the D6, D35 or Central Bohemia part of D3," he said.

The government recently said that 177km of motorway is under construction and €3.32 billion has been earmarked for construction of new motorway sections and railway improvements. Around a quarter of the money will likely come from European Union sources.

For more information on companies in this article

Related Content

  • Strabag wins Polish road contracts worth €170 million
    November 2, 2017
    European-based construction group Strabag, through its Polish subsidiaries, has won three road contracts from Poland’s General Directorate for National Roads and Motorways (GDDKiA). The total contract value is split among two lots along the S19 north of Warsaw for €73 million and €43 million as well as one lot along the S61 in southern Poland for €54 million. “Poland is our third most important market [and] we celebrated our 30th anniversary there,” said Thomas Birtel, chief executive of Strabag Group.
  • Santiago’s Autopista Central in line for improvements
    June 18, 2015
    Motorway operator Autopista Central de Chile (AC) has applied to the Ministry of Public Works to make improvements worth around US$340 million to the Autopista Central system in the capital Santiago. Improvements are scheduled for the Quilicura area. AC will present an environmental impact and engineering study this summer to the ministry. Much of the work will take place at night time to avoid traffic disruption. Autopista Central consists of two highways, the westernmost of which branches off from t
  • Terex TA300 blazes trail for new stretch of D11 Czech motorway
    March 12, 2018
    Workers on a stretch of the Czech Republic’s D11 motorway have found a friend in the Terex TA300 28tonne articulated dump truck. Czech-based company ATM CZ has a two-year contract to extend the 90km D11 by 15.5km; no easy task, from earthwork to compaction and paving. The road connects the Czech capital Prague and the city of Hradec Králové. Once the project is complete, the motorway will continue to Smiřicemi. The motorway is part of European route E67 – the so-called Via Baltica – from Prague to the Fin
  • Strabag to upgrade Austria’s A10 Oswaldibergtunnel
    July 13, 2015
    Austrian construction group Strabag will modernise the A10 Oswaldibergtunnel for Asfinag, Austria’s national motorway operator. Work on both tubes, each 4.3km long, will start this month and be finished in June 2017. The €34 million contract includes upgrading the road and tunnel surfaces as well as reinstalling all electrical and mechanical equipment. Thomas Birtel, chief executive of the Strabag Group, said in a statement that the contract will be covered by the group’s construction, engineering and c