Skip to main content

Fehmarn Belt Fixed Link could open by 2025 at earliest

The ambitious Fehmarn Belt Fixed Link, connecting Denmark and Germany, will open in 2025 at the earliest, according to the Danish finance ministry. Femern A/S, the Danish government-owned company managing the project, confirmed the note from the government. It also said the ministry still has financial concerns over the deal to build an immersed tunnel connecting the towns of Rødby in Denmark’s southern Zealand with Puttgarden in northern Germany. Of particular is the time for a construction company t
November 27, 2015 Read time: 3 mins
The ambitious Fehmarn Belt Fixed Link, connecting Denmark and Germany, will open in 2025 at the earliest, according to the Danish finance ministry.

4782 Femern A/S, the Danish government-owned company managing the project, confirmed the note from the government. It also said the ministry still has financial concerns over the deal to build an immersed tunnel connecting the towns of Rødby in Denmark’s southern Zealand with Puttgarden in northern Germany.

Of particular is the time for a construction company to receive full payback for the project because of declining traffic volume forecasts.

Financing includes European Union subsidies amounting to nearly €590 million during 2016-2019, but with delays to start of construction subsidies may be cut back.

World Highways reported in October that a study by Danish consultant Hans Schjær-Jacobsen had shown that payback period for the proposed 17km tunnel would be close to 50 years. This is a decade longer than estimated by the developers of the project, the study noted.

The Fehmarn Belt Fixed Link will connect the German island of Fehmarn with the Danish island of Lolland. The tunnel, incorporating two railway tunnels, two motorway tunnels and an emergency tunnel, will cross the Fehmarn Belt, or Fehmarn Strait, in the Baltic Sea.

According to the study, driver fees alone are unlikely to be sufficient for the financing of the link. Danish taxpayers will likely have to contribute to the project. More research is needed to pinpoint the finer details of the project whose estimated cost has been rising over the past year.

The Fehmarn Belt immersed tunnel project was approved by the Danish parliament in April this year. It is supposed to be built, owned - apart from the German land works - and operated by a Danish state agency called Femern, a subsidiary of Sund & Bælt Holding, and financed by loans guaranteed by the Danish government.

World Highways also reported in February that the Danish government was talking to contractors over the latest rise, a jump of €1.2 billion, in cost estimates for entire project. Contractors estimated an extra €295.5 million will be needed.

This is in addition to a statement in November 2014 by the contracting company Femern saying that costs had risen nearly by €900 million.

For more information on companies in this article

Related Content

  • Province halts planned Vancouver bridge to replace Massey Tunnel
    September 14, 2017
    Canada’s province of British Columbia has stopped procurement for a proposed 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. Local media said the province would pay $1.65 million to two of the three shortlisted consortia which had already submitted bids for what is officially called the George Massey Tunnel Replacement project.
  • Strabag raises 2011-2012 outlook
    May 9, 2012
    After a solid first quarter 2011, Strabag, Central and Eastern Europe’s largest construction company, has raised its outlook for the financial years 2011 and 2012. According to the new forecast, Strabag expects an output volume of €14 billion in 2011 (previous target €13.5 billion), with earnings before interest and taxes (EBIT) forecast to increase to €320 million, after €295 million had been predicted. For 2012, the company had expected an output volume of €13.7 billion and an EBIT of €300 million, whi
  • Highways England: new agency with long-term investment strategies
    August 18, 2015
    Highways England, created out of the old Highways Agency, was set up on April 1 to oversee a closer relationship between government client and private contractors. World Highways went to a recent forum in London to hear both sides declare their hopes and challenges. Government reforms are often met with a certain amount of scepticism thanks to years of disillusionment over forgotten ministerial promises. Given that, highway contractors in the UK could have been forgiven if they had raised their eyes skyward
  • Major highway improvement project on track in Colombia
    February 29, 2016
    In Colombia plans are now in hand for a major highway improvement project. Concesión Pacífico Tres is joint concession operator of the tolled links for Colombia’s major commercial regions connecting with the Pacific port hub. US firm Milbank, Tweed, Hadley & McCloy has provided advice to Colombian Concessionaire Concesión Pacífico Tres SAS and its sponsors, MHC Ingeniería y Construcción de Obras Civiles and Construcciones El Cóndor, and Costa Rica’s infrastructure company Constructora MECO. The advice was