Skip to main content

Colombian highway projects under development

A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches. The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km
June 29, 2018 Read time: 2 mins

A finance package has been secured in Colombia for the Autopista al Mar 1 highway project. A loan worth close to US$206 million is being provided by the national development bank, Financiera de Desarrollo Nacional (FDN). The highway forms part of Colombia’s 4G infrastructure development plan and the finance package will be provided in three separate tranches.

The construction work is being carried out by a consortium comprising Strabag, Concay and Sacyr Concesiones. The project will upgrade the 71km existing route connecting Santa Fe in Antioquia and Bolombolo. The work also includes widening the 43km route between Medellin and Santa Fe, in Antioquia Department. Other key portions of the project include the construction of the 4.6km Tunel de Occidente as well as building no less than 39 bridges.

Meanwhile work to build the Toyo Tunnel (Tunel del Toyo) in Antioquia Department is now around 64% complete. The tunnel measures 9.8km long and should be ready for traffic by 2022. The link is being built bya consortium comprising FCC Construction, Cass Builders and Company, Carlos Alberto Solarte and Estyma Studies and Handling. The tunnel route runs underneath the mountains of western Antioquia, an area that is difficult to access at present due to its challenging topography. Construction of the route will improve transport to the port of Uraba, located some 80km to the north of the city of Medellin. Work is also underway on the nearby Tunel 18, a 258m tunnel section located close to Canasgordas, as well as the Puente 13 bridge and a number of access roads

However there are questions surrounding the highway widening project  for the Bogota-Girardot route. A preliminary investigation is being carried out into the construction partnership handling the $586.3 million road widening work along a 154km stretch of the highway connecting the capital Bogota with Girardot. The investigation is being carried out by the official the industry and trade watchdog (SIC), focussing on the tender process.

Related Content

  • Expectations for growth of UAE infrastucture
    February 9, 2012
    The INTERMAT Middle East event is being launched at a pivotal time of major infrastructure development in the region. As with most sectors, the highways industry has not had a fantastic 18 months in the Gulf. Not only has the recession impacted the delivery of projects across the board, GCC Governments' attention have been switching increasingly to rail, as plans to roll out a Gulf-wide rail system gather steam. GCC countries will invest over US$119.6 billion in infrastructure projects over the next decade
  • Key Chilean connections
    November 27, 2012
    Strong interest is being shown in the construction sector in Chile for the project to build the Chacao Bridge. The tender process is due to open in the first half of 2013 and a large number of contractors, over 30, have already acquired terms and conditions of the works package. The construction project is expected to cost US$740 million. Bidding is expected to close in early 2014 and the winner will be selected and the contract awarded. Work should start in 2015 and the completion date will be in 2019. A
  • Colombian road project
    April 23, 2012
    Road management firm Ruta del Sol intends to invest US$846 million in Colombia’s Ruta del Sol highway during 2012. The highway connects Colombia’s Central region with the Atlantic coast. Ruta de Sol has already invested $282 million in maintenance works for the 600km or so of existing highway and intends to extend the highway by a further 100km. Ruta de Sol has already opened the first 10km of the highway that forms part of the Sector 2 stretch of the, linking Puerto Salgar (Cundinamarca) to San Roque (Cesa
  • Brazil’s key projects gathering pace
    January 5, 2021
    Momentum is gathering for two key transport link projects in Brazil.