Skip to main content

Colombia: Bogota-Tunja road project completed

Work on the dual carriageway project between the cities of Bogota and Tunja in the Boyaca region is finished, said Colombia's vice president German Vargas Lleras. The 206km project, costing nearly US$367 million, included construction of a 6km dual carriageway.
January 10, 2017 Read time: 1 min
Work on the dual carriageway project between the cities of Bogota and Tunja in the Boyaca region is finished, said Colombia's vice president German Vargas Lleras.

The 206km project, costing nearly US$367 million, included construction of a 6km dual carriageway.

Related Content

  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Bratislava bypass and Karpaty tunnel completion set for 2030
    June 18, 2018
    Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
  • Oslo Fjord Link a priority for 2024
    October 20, 2023
    The new tunnel will run parallel with the existing 7.3km-long structure which connects Hurum and Frogn near the Norwegian capital Oslo.
  • Metrostav and Budimex among bidders for Poland’s S7 section
    April 25, 2017
    Poland’s highways directorate, GDDKiA, says 12 bids have been received for construction of the second section of the S7 dual carriageway. The 15km section will run from the Lesznowola junction to the Tarczyn Polnoc junction. Metrostav submitted the highest offer at €118 million, while the cheapest offer came from a consortium of Porr Polska Infrastructure and Porr Bau. Other bidders include others, Budimex, Intercor and Polaqua.