Skip to main content

China kick-starts Pakistan’s Gwadar East Bay Expressway

China is offering an interest-free US$130 million loan to Pakistan for construction of the Gwadar East Bay Expressway in the southwest port of Gwadar. The proposed 19km expressway will connect the Gwadar Port with the Mekran Coastal Highway, passing along the east bay of Gwadar City. The loan is part of a wider financing deal whereby China has a converted $225.5 million loan for the Gwadar International Airport into a loan. Work on the highway is expected to start in November for completion at the
September 2, 2015 Read time: 1 min
China is offering an interest-free US$130 million loan to Pakistan for construction of the Gwadar East Bay Expressway in the southwest port of Gwadar.

The proposed 19km expressway will connect the Gwadar Port with the Mekran Coastal Highway, passing along the east bay of Gwadar City.
 
The loan is part of a wider financing deal whereby China has a converted $225.5 million loan for the Gwadar International Airport into a loan.

Work on the highway is expected to start in November for completion at the end of 2017, Pakistani media reported.

Highway and airport improvements are part of a plan by the Balochistan provincial government tha includes a special economic zone and industrial parks to boost the economy.

Related Content

  • Construction of Adelaide’s Northern Connector expressway is set to start in January
    September 15, 2015
    Construction of Adelaide’s Northern Connector project will start early next year after financing was recently agreed between the federal and South Australia state governments. The federal government will pay for 80% - US$562 million - of the cost, with South Australia picking up the remaining 20% of the estimated US$702 million price tag. The road will not be a direct toll highway but the country’s first network fee expressway where trucks are charged on the basis of road use. The road is proposed
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp
  • Transpordiamet opens Tartu procurement
    May 20, 2021
    The Estonian Transport Administration - Transpordiamet - is tendering for the Tallinn–Tartu–Võru–Luhamaa highway section of the planned Western Tartu Bypass.
  • Engineering the Saadiyat Expressway
    February 24, 2012
    A new bridge, said to be the largest in the United Arab Emirates (UAE) in terms of area, is being constructed as part of a major highway project. The US$550 million Saadiyat Expressway project, which involves Leighton Construction (Abu Dhabi), related to one of Australia's largest contracting groups, in constructing a ten-lane, 6.5km long highway to link the UAE's main city, with an exclusive island lying just offshore.