Skip to main content

Building links to Paraguay’s new bridge

New road connections will have to be built for the second Parana River crossing in Paraguay. In all around 37km of new road connections will be required, costing US$180 million. This work will also require the construction of two smaller bridges as well as an overpass section. Financing for the work is being provided via the Development Bank of Latin America (CAF).
June 10, 2019 Read time: 1 min

New road connections will have to be built for the second Parana River crossing in Paraguay. In all around 37km of new road connections will be required, costing US$180 million. This work will also require the construction of two smaller bridges as well as an overpass section. Financing for the work is being provided via  the Development Bank of Latin America (CAF).

Related Content

  • Chinese firm wins highways expansion project to decongest Nairobi
    January 5, 2017
    A Chinese contractor is carrying out a major road project intended to cut congestion in Kenyan capital Nairobi – Shem Oirere writes Chinese contractor China Wu Yi has won a US$163 million contract for the reconstruction and expansion of a 25km highway leading out of Kenya’s capital Nairobi with financing from the World Bank. The contract was awarded by the country’s National Highways Authority (KeNHA), a state-owned road agency responsible for the management, development, rehabilitation and maintenance of i
  • Bangladesh highway contract awarded
    November 15, 2022
    A major Bangladesh highway contract has been awarded.
  • New Thailand-Malaysia bridge project
    August 14, 2024
    A new bridge linking Thailand and Malaysia has been agreed.
  • Nepal's road safety upgrade
    April 26, 2012
    The Nepalese authorities closed the incomplete third phase section of the BP highway to traffic following two fatal accidents recently. In all 58 people were killed in the two accidents on the Khurkot-Nepalthok stretch of the BP highway route, although construction work on the stretch has yet to be completed. So far 123km of the 158km route has been built by a Japanese contractor and these three stretches of the road have been opened to traffic. Of the remaining 37km being built, some 14km should be complet