Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Brazil launches new transport infrastructure investment plan
    August 30, 2012
    The Brazilian government has announced a new transport infrastructure investment plan involving the concession of motorway operations and modernisation of the railway sector. The private public partnerships are predicted to lead to an investment of US$65.68 billion (BRL 133bn) in the next 25 years, including US$ 39.63 billion (BRL 80bn) to be spent in the first five years of the contract.
  • Czech transport connections
    April 28, 2020
    Czech transport connections will benefit from spending.
  • Tenders coming for Nowe Miasto Lubawskie ring road second phase
    September 9, 2016
    The Polish government has approved construction of the second phase of the ring road around Nowe Miasto Lubawskie. A deal is expected to be signed at the beginning of next year to complete the 18km road.
  • Slovakian road protests likely over missing D3 sections
    September 1, 2017
    More road blockades are likely after Slovakia’s state motorway company NDS announced it will not tender for missing sections of the D3 motorway this year. Residents of some towns have blocked sections of roads this year urging the government to speed construction of the D3 to help; boost their local economies, according to Slovakian media.