Skip to main content

Budimex wins a 20km section of S61 from Wysokie junction to Raczki

Polish contractor Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland. The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced. Budimex bid just over €484 million for the 29-month design-build contract. Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports. The S61 is part of the
February 16, 2018 Read time: 2 mins

Polish contractor 3302 Budimex has won a tender to build a 20km-long section of the S61 dual carriageway in Poland.

The section runs from the Wysokie junction to Raczki, the national highways authority GDDKiA announced.

Budimex bid just over €484 million for the 29-month design-build contract.

Last summer, the Italian contractor Impressa Pizzarotti picked up a deal for 24km of the S61 from Suwalki to the border with Lithuania for around €144.6 million, according to media reports.

The S61 is part of the greater European route E 67 running from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia and Estonia. It goes via Prague, Warsaw, Riga, Tallinn and – by ferry – Helsinki, a length of nearly 1,700km.

It is also known as the Via Baltica between Warsaw and Tallinn, a distance of 970km. Most of the route is not motorway but some sections, such as the one in Poland, are dual carriageway.

For more information on companies in this article

Related Content

  • Czech highway connection finally gets go-ahead
    February 28, 2012
    A long running land dispute in the Czech Republic has finally been settled, which will allow a key road link to be built after years of delay.
  • Adani-led consortium wins Chhattisgarh highway project
    April 10, 2018
    A consortium led by Adani Enterprises has won a US$175 million highway contract in Chhattisgarh from the National Highways Authority of India. Work in Chhattisgarh, one of India’s 29 states, will be done under a 15-year Hybrid Annuity Model and take nearly two years. Chhattisgarh is heavily forested with many rivers and dramatic waterfalls, making it one of India’s major supplier of hydro-electricity. The highways project involves four-laning a 53km stretch on the Bilaspur-Pathrapali section of the NH
  • Bridge of international accord from Russia-China
    May 29, 2018
    A new bridge project joining China and Russia is a sign of international accord between the two nations – Mike Woof writes A new bridge spanning what China calls the Heilongjiang River and which is known as the Amur River in Russia, is a clear sign of an important international accord between the two countries. Discussions over the bridge project were first started between China and Russia in the 1980s, with both nations seeing many changes in leadership since that time. But while the political discussion
  • Intelligent road studs aim to make roads safer
    May 3, 2012
    High-tech road markings are being used in a bid make roads safer in Europe as Patrick Smith reports Intelligent road studs are being installed on two of the busiest sections of the main roads heading towards the port of Dover in County Kent, south-east England.