Skip to main content

Brazil budget cuts cause project delays

Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national econ
April 30, 2015 Read time: 2 mins
Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national economy will be given priority. These projects include the expansion of the BR-163 highway, as this route is key to the transportation of foodstuffs in the Central-West region. The list of projects now likely to be postponed has not so far been released however due to concerns over the potential political backlash. When this list becomes available it is likely to trigger criticism.

Related Content

  • Brazil’s booming economy fuels infrastructure demand
    July 18, 2012
    The emergence of Brazil as a major economic force and its need to improve infrastructure is proving a magnet for investment. Patrick Smith reports Brazil is now the sixth biggest economy in the world according to its Finance Minister Guido Mantega. The largest country in South America with a population of 190 million and one of the BRICS, (Brazil, Russia, India, China, South Africa, Brazil’s economy grew 2.7% in 2011 and is now worth $2.5 trillion, having overtaken the UK. With big oil and gas reserves stil
  • Brazil’s booming economy fuels infrastructure demand
    July 18, 2012
    The emergence of Brazil as a major economic force and its need to improve infrastructure is proving a magnet for investment. Patrick Smith reports Brazil is now the sixth biggest economy in the world according to its Finance Minister Guido Mantega. The largest country in South America with a population of 190 million and one of the BRICS, (Brazil, Russia, India, China, South Africa, Brazil’s economy grew 2.7% in 2011 and is now worth $2.5 trillion, having overtaken the UK. With big oil and gas reserves stil
  • The payload answer for ADT haulage?
    July 8, 2016
    Will increased ADT load capacity provide a suitable solution to increasing aggregate and earthmoving haulage needs? Mike Woof reports The rule of thumb with off-highway machinery is that for bulk operations, larger equipment can deliver economies of scale, with bigger payloads allowing a better cost/tonne. Heavier machines may be less versatile than more compact units, so a type of equipment that retains its versatility as it is scaled up in size can offer major benefits. For the articulated dumptruc
  • Germany’s crumbling roads costing billions
    April 21, 2025
    Germany’s crumbling roads are costing billions to repair.