Skip to main content

Brazil budget cuts cause project delays

Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national econ
April 30, 2015 Read time: 2 mins
Brazil’s Transport Ministry is to postpone 30 major projects due to budget cuts. The Ministry of Transport says that 30 projects that would have been launched in 2015 will now be postponed due to the reduced budget. The cut is estimated to be between 30% and 40% of the Ministry's budget, cutting up to US$2.04 billion in funding. Instead the Transport Ministry will now focus on projects that are already complete or close to being finished. However those projects considered to be of value to the national economy will be given priority. These projects include the expansion of the BR-163 highway, as this route is key to the transportation of foodstuffs in the Central-West region. The list of projects now likely to be postponed has not so far been released however due to concerns over the potential political backlash. When this list becomes available it is likely to trigger criticism.

Related Content

  • London Lower Thames Crossing link
    October 10, 2018
    Progress is being made with regard to the proposed Lower Thames Crossing project close to London.
  • Australia bites the bullet on roads reform
    August 2, 2012
    Predictions of impending doom for Australia's roads infrastructure have given the nation's governments and roads stakeholders the fright they needed to collaborate on roads policy. If the latest initiatives Australia is putting in place do produce the full extent of the roads reform required, there will be some lessons there for the whole world Whether through pride or stubbornness, or a combination of both, each state and territory of Australia has always liked to do things its own way. To some extent and
  • US$1.27 billion Vietnam transport infrastructure works proposed
    August 29, 2024
    Transport infrastructure works worth almost US$1.27 billion are being proposed for Vietnam.
  • Brazil’s booming economy fuels infrastructure demand
    January 9, 2013
    The emergence of Brazil as a major economic force and its need to improve infrastructure is proving a magnet for investment. Patrick Smith reports. Brazil is now the sixth biggest economy in the world according to its Finance Minister Guido Mantega. The largest country in South America with a population of 190 million and one of the BRICS, (Brazil, Russia, India, China, South Africa, Brazil’s economy grew 2.7% in 2011 and is now worth $2.5 trillion, having overtaken the UK. With big oil and gas reserves sti