Skip to main content

A6 project between Weinsberg and Wiesloch/Rauenberg set to start

Work will soon start on the €1.3 billion project to widen a stretch of the A6 motorway, one of Germany’s most congested highways. Both sides of the motorway between the Weinsberg and Wiesloch/Rauenberg junctions will be expanded. On 25 km of the section being expanded under the project – altogether 47.1 km – the number of lanes will be increased from four to six. The project also encompasses the construction of the 1.3km-long Neckartal Bridge. Preparatory work for the public-private partnership has
January 26, 2017 Read time: 2 mins
Work will soon start on the €1.3 billion project to widen a stretch of the A6 motorway, one of Germany’s most congested highways.

Both sides of the motorway between the Weinsberg and Wiesloch/Rauenberg junctions will be expanded.

On 25 km of the section being expanded under the project – altogether 47.1 km – the number of lanes will be increased from four to six. The project also encompasses the construction of the 1.3km-long Neckartal Bridge.

Preparatory work for the public-private partnership has already begun with project completion in about five and half years, in July 2022. Clients for the project are the Federal Ministry of Transport and Digital Infrastructure, the state of Baden-Württemberg and Stuttgart Regional Board.

The Federal Government, represented by the regional administrative council (Regierungspräsidium) of Stuttgart, had initially put the roadworks to public tender. This PPP project is designed as a business model type 'A' - or availability model – where the Federal Government makes payment to the private contractor based on the passability of the lanes.

Apart from construction work, the project involves operation and maintenance for the entire 47.1km section over 30 years. The bidding consortium ViA6West made up of the construction firms 981 Hochtief and 1249 Johann Bunte Bauunternehmung together with the financial investor 3634 DIF Infrastructure IV was awarded the concession to carry out the PPP project last October. Construction accounts for around €600 million of this total. Hochtief PPP Solutions has a 30% share in ViA6West, DIF has 50% and Johann Bunte holds 20%.

Consulting engineers Schüßler-Plan was leader of an interdisciplinary advisory team consisting of engineers, lawyers, financial service providers and business consultants. The team worked on conceptual design, consulting and management of the complex bidding procedure. Schüßler-Plan itself carried out economic feasibility studies.

Consulting engineers 1419 Arup provided technical due diligence for one of the bidders and the banks.

The project is qualified for the Juncker Plan under which the EIB –European Investment Bank - and the European Commission provide funds for infrastructure projects in order to overcome the current investment shortfall in Europe. KfW IPEX-Bank is offering a tranche as a project bond, which involves the project company placing the bond on the capital market.

For more information on companies in this article

Related Content

  • Loans for Georgian roads
    July 20, 2012
    Loans from the European Investment Bank (EIB) and the EU will finance highway work in Georgia. The funds will be used to pay for the construction of the high-speed motor road running from West – East across Georgia. The EIB will give a long-term preferential credit worth €170 million, while the EU will provide a €20 million grant. As part of the project, a four lane highway measuring 52km will be built from Samtrediya – Grigoleti, while the 16km section Grigoleti - Kobuleti stretch will be repaired.
  • Loans from Europe will fund highway works in the nation of Georgia
    May 15, 2012
    Loans from the European Investment Bank (EIB) and the EU will fiancé highway work in Georgia. The funds will be used to pay for the construction of the high-speed motor road running from West – East across Georgia. The EIB will give a long-term preferential credit worth €170 million, while the EU will provide a €20 million grant. As part of the project, a four lane highway measuring 52km will be built from Samtrediya – Grigoleti, while the 16km section Grigoleti - Kobuleti stretch will be repaired.
  • Tunnel contract for Bosnian highway
    December 17, 2012
    Turkish company Cengiz Insaat has reportedly been awarded the €115 million contract for the construction of the Suhodol-Tarcin motorway in Bosnia. The works, which will be done in cooperation with Bosnian company Euroasfalt, will include two tunnels. One of them will be 400m long, while the other will be 2.5km. Works are expected to be completed by 2014. Meanwhile, bids are now being offered for a major highway project in Bosnia. This follows the opening of the tender process for the project by Bosnian high
  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost