Skip to main content

Power supply deal for Volvo Penta in Lebanon

Volvo Penta has supplied the first of its new power generation engines to its long-term business partner, Khonaysser Motors. The TWD1645GE engine was then installed in a prototype genset by the Lebanese genset manufacturer. This unit was field-tested by two of Khonaysser’s customers and one year later, the product has proven to be a success. When Lebanese electricity supply company Ishtirak El Hassan needed additional power sources to keep up with demand, it was eager to field-test the new genset from Khon
June 25, 2018 Read time: 2 mins
The Volvo Penta engines have proven successful in a generator application
Volvo Penta has supplied the first of its new power generation engines to its long-term business partner, Khonaysser Motors. The TWD1645GE engine was then installed in a prototype genset by the Lebanese genset manufacturer. This unit was field-tested by two of Khonaysser’s customers and one year later, the product has proven to be a success.


When Lebanese electricity supply company Ishtirak El Hassan needed additional power sources to keep up with demand, it was eager to field-test the new genset from Khonaysser Motors. With an unstable mains electricity supply, Lebanon is frequently subjected to power cuts. To ease the burden, Ishtirak El Hassan uses gensets to produce electricity for a range of customers including small companies. The company began field-testing the new genset equipped with 783 Volvo Penta’s latest power generation diesel engine, the TWD1645GE, in 2017. The firm was impressed with the unit’s performance and actually wanted to retain it once the agreed test period was complete.

The gensets need to be able to operate for up to 24 hours continuously, and more than 6,500 hours/year. Ishtirak El Hassan needed a genset with a high-performance engine, and the 16litre TWD1645GE has a high power density for its class.

Because the unit performed so well, the customer opted to buy one of the engines once the test period was complete. The Middle East is a big market for gensets due to difficulties in the supply of mains electricity. According to Beirut-based Khonaysser Motors, the engines have performed well and the dual-circuit cooling system is perfectly adequate for the local climatic conditions. Since the tests were completed, the firm says it has supplied several of the generator sets to customers. Key features of the new engine include its ability to cope with harsh environments, its compact design and low fuel consumption.

For more information on companies in this article

Related Content

  • Volvo CE maintains strong position
    July 20, 2022
    Volvo CE is maintaining its strong financial position.
  • How to reduce environmental impact with Cummins Performance Series
    May 10, 2022
    There has been significant focus on alternative power solutions for off-road vehicles and equipment such as hybrid, full electric and hydrogen. Whilst these solutions will be suitable in the long term, it will take time for these technologies to be competitive and enable wider adopted in the construction industry.
  • Lighting innovations boosting brightness, cutting costs
    January 27, 2014
    CU Phosco’s new P850 LED main road lantern has just seen its first major deployment – between Junctions 16 and 17 of the A55, a strategic road which skirts the North Wales coastline – Jason Barnes reports The A55 is a grade-separated dual carriageway also known as the North Wales Expressway. Some 139km long, it originally ran from Chester to Bangor but was extended across the Isle of Anglesey into Holyhead Docks in 2001 under a project part-funded by the European Union.
  • Drilling rig for Russian road project
    March 18, 2016
    A Sandvik Construction DQ500 dimensional stone drill rig has proved useful on a road project in Dagestan, Russia. Local contractor, Dagestan Vzryv Stroy, is using the drill rig to work on the reconstruction of the Avar-Kakheti road. The reconstruction of the Avar-Kakheti road began in early 2014. The local authorities were keen to rebuild a section of the 83km route where it runs through mountains in order to connect Russia with Georgia. The economically important project was given a national grade as i