Skip to main content

Perkins Platinum Protection extends warranty for up to five years

Perkins Platinum Protection is an extended warranty package that has been introduced for new Perkins engines. With a flexible structure, the Platinum Protection scheme is available from two to five years duration, and for up to 5,000hours, offering comprehensive cover for up to 100% of components. Perkins said the warranty covers OEMs from unexpected repair bills and cover must be upgraded before the standard engine warranty expires.
April 20, 2016 Read time: 1 min

299 Perkins Platinum Protection is an extended warranty package that has been introduced for new Perkins engines.

With a flexible structure, the Platinum Protection scheme is available from two to five years duration, and for up to 5,000hours, offering comprehensive cover for up to 100% of components. Perkins said the warranty covers OEMs from unexpected repair bills and cover must be upgraded before the standard engine warranty expires.

All videos

For more information on companies in this article

Related Content

  • Komatsu adds WA470 to its Dash-7 wheel loader range
    April 18, 2013
    Komatsu has unveiled its 23,590kg operating weight WA470-7 wheel loader, which offers improved efficiency, lower fuel consumption, improved operator comfort and enhanced serviceability. It is powered by a 203kW Stage IIIB/ EPA Tier 4I Komatsu SAA6D125E-6 engine, which is said to lower fuel consumption by 10% to 15% compared with the WA470-6. The engine is fitted with EGR, a hydraulically-actuated variable geometry turbocharger, and an automatically regenerating DPF. As with all Komatsu Stage IIIB machines,
  • Perkins opens test facility
    March 1, 2012
    Diesel engine producer Perkins has now opened its research facility, an operation in which the firm has invested some €21.2 million (£19 million).
  • New tunnel link for Rio de Janeiro
    November 15, 2013
    Excavation work is now underway in Brazil for the Transolimpica tunnel. The US$688.6 million project forms part of the preparation works for the 2016 Olympic Games. The 23km route will connect Barra da Tijuca and Deodoro in Rio de Janeiro. The construction work is expected to last 18 months and should be complete by December 2015. Work on the Transolimpica route is being carried out by the Viario consortium, which comprises Odebrecht, Invepar, and CCR. The tunnel will feature two lanes in each direction whe
  • JCB backhoes go platinum
    November 14, 2023
    The first JCB model, in 1953, combined a lightweight backhoe with a Major Loadall tractor loader.