Skip to main content

Improved consolidation

Upgrades to Dynapac's Racoon+ poker drive include rubber protection against shocks and prevent the drive unit's body from being in direct contact with dust, helping to protect the electric motor. This flex shaft concrete vibrator is a complete high frequency vibration system eminently suited for daily operation on small and medium sites for applications such as walls, floors and pre-cast fabrication.
February 15, 2012 Read time: 2 mins
Upgrades to 206 Dynapac's Racoon+ poker drive include rubber protection against shocks and prevent the drive unit's body from being in direct contact with dust, helping to protect the electric motor. This flex shaft concrete vibrator is a complete high frequency vibration system eminently suited for daily operation on small and medium sites for applications such as walls, floors and pre-cast fabrication.

The Racoon+ features a quick connection device between the drive unit and the flexible shaft so that the operator can change the shaft easily. The unit is powered through a 5m electric cable and has a 1.5kW drive unit operating at 12,000rpm, with a range of pokers heads from 21-59mm in diameter. The drive unit has a durable ergonomic, polycarbonate fibre-clad case fitted with a built-in handle. Other features include an overload protection function integrated in the on/off switch shutting off the drive unit and an automatic cut-out that automatically stops the drive unit when completely worn out, preventing damage to the electric motor.

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • New low emission engines benefit from technology
    January 16, 2020
    The latest generation of low emission diesel engines are benefiting from key technology advances, while other power options are also being explored - Mike Woof writes
  • Embedded sensors help deliver self-monitoring roads
    November 22, 2021
    As road authorities look to automate their road monitoring and maintenance, we will need more and more sensors within our highway networks