Skip to main content

Sandvik’s telescopic chute to cut dust

Sandvik says that its novel WE6000i telescopic chute can help cut dust emissions and improve working efficiency on quarry sites. The unit can be used with a wide variety of equipment and has been developed from the proven WE series. The new units can be fed by conveyors with a belt width of less than 800mm and helps minimise dust emissions, as well as benefiting the working environment and surrounding areas.
March 14, 2017 Read time: 2 mins
The new telescopic chute unit from Sandvik is said to reduce dust emissions on quarry sites
RSS325 Sandvik says that its novel WE6000i telescopic chute can help cut dust emissions and improve working efficiency on quarry sites. The unit can be used with a wide variety of equipment and has been developed from the proven WE series. The new units can be fed by conveyors with a belt width of less than 800mm and helps minimise dust emissions, as well as benefiting the working environment and surrounding areas.

Fewer dust emissions means lower clean-up costs, and reduced need for maintenance, service and repair work all over the plant. A telescopic chute can also reduce stockpile segregation and improve product quality. A key feature is that a vacuum is generated inside by the material flow, reducing the requirement for expensive, service-demanding filtration systems. The chute is simple and rugged in design and is said to offer a good ratio between minimum and maximum length. The number of conical chute segments varies depending on the height of the stockpile and the feed conveyor. The unit can be operated from a control panel or manually via remote control and can be used with a wide variety of materials. The chute also senses its height above the material stockpile and automatically adjusts.

For more information on companies in this article

Related Content

  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO
  • Versatile asphalt plants from Marini-Ermont
    April 14, 2022
    MARINI-ERMONT is offering two innovative new continuous flow type asphalt plants that offer a combination of versatility and mobility.
  • Asphalt plant technology meets market needs
    February 16, 2012
    Plants for mixing asphalt are becoming more sophisticated than ever, while users are looking for ecological and technological benefits. Patrick Smith reports. When the Adige Bitumi Group decided to renew its old M 260 plant it chose to collaborate with Marini for the design and development of a plant with production of 280-300tonnes/hour.
  • CIFA’s new plant and pump developments
    May 5, 2022
    CIFA is offering an improved batching plant line-up, along with introducing its newest pumps to the North American market