Skip to main content

Rubble Master’s RM MSC5700M rocks in Slovenia

Slovenian contractor CP Ptuj has put a Rubble Master RM MSC5700M tracked mobile post-screen to work beside an RM 100GO! impact crusher for efficient production. CP Ptuj has been using the RM 100GO! impact crusher together with a mesh deck screen and pivoting refeeding belt in one of the company’s quarries near Maribor since 2016. "The impact crusher now has 1,500 operating hours on the clock," said Martin Turk, managing director of CP Ptuj. This crusher, deck screen and refeeding belt combination crushes
April 17, 2018 Read time: 2 mins
Slovenian contractor CP Ptuj has put a Rubble Master RM MSC5700M tracked mobile post-screen to work beside an RM 100GO! impact crusher for efficient production.
Slovenian contractor CP Ptuj has put a 747 Rubble Master RM MSC5700M tracked mobile post-screen to work beside an RM 100GO! impact crusher for efficient production.


CP Ptuj has been using the RM 100GO! impact crusher together with a mesh deck screen and pivoting refeeding belt in one of the company’s quarries near Maribor since 2016.

"The impact crusher now has 1,500 operating hours on the clock," said Martin Turk, managing director of CP Ptuj. This crusher, deck screen and refeeding belt combination crushes extremely abrasive rock from the River Drau to be used as high-quality aggregate in road construction.

Crushing abrasive river rock and then screening the moist material is by no means easy.

"We expected the MSC5700M to have the same quality as the crusher and seeing as the price was okay, we seized the opportunity," said Turk.

"We tried out a few things to begin with,” said Zdenko Kraljevi, machine fleet manager for CP Ptuj. “With the different screen configurations, such as square, long or harp, for example, which RM offers for the RM MSC5700M mobile post-screen, a wide variety of materials – even difficult ones – can be perfectly processed.”

The angle adjustment of the screen box and height adjustment of the discharge belt make screen changing easier, according to Rubble Master. The two RM machines are ideal for processing a broad range of input materials in a variety of places at any time and always produce perfect, high-value aggregate for the multitude of applications.

Rubble Master, based in Linz, Austria, has exports accounting for more than 97% of its business. Core markets are central Europe and North America.

For more information on companies in this article

Related Content

  • From managed asset to service provider: the future highway
    May 20, 2019
    Every day we hear about Mobility as a Service (MaaS), but what about Roads as a Service? Geoff Hadwick reports from the ERF in Brussels The familiar physical asset called the road will increasingly be seen as part of an emerging global services sector. Given that, the role of the road is changing, notes Christophe Nicodème, general director of the European Union Road Federation (ERF). We need to think much more carefully about planning highway infrastructure in terms of people’s needs, said Nicodème,
  • PPRS: action needed now on US bridges
    March 27, 2018
    More than 9% of major highway bridges in the US are “rated structurally deficient” and in need of “urgent attention”, according to Bud Wright, chief executive of AASHTO, the American Association of State Highway and Transportation Officials. Action is needed now. In a recent infrastructure report, AASHTO reported that the US has just over 614,000 road bridges, 25% of which are 50 or more years older. Also, around 56,000 - 9.1% - of them are now structurally deficient. This is a shocking and growing
  • Asphalt plants looking at greener production systems
    April 11, 2012
    A wide variety of new equipment and technology to assist production at asphalt plants is about to be launched onto the market, while asphalt producers are continuing to look at greener working practices. Guy Woodford reports Lintec, in partnership with Loesche, recently created what they say is the world's first containerised Coal Mill Plant for independent coal dust supply at the jobsite which offers mobility and high economic efficiency through the substitution of gas or oil with coal. The mobile co
  • First deck span completed for Mersey Gateway's north approach viaduct
    April 4, 2016
    The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. Work started on site in May 2014 to build a six-lane toll bridge over the Mersey River between the towns of Runcorn and Widnes and opening is set for the autumn of 2017. As well as construction of the new bridge, works include the upgrading of 7km of highway to the north and south of the river - the main bridge is 2.2km long – and changing traffic flow so the majority of tra