Skip to main content

Innovation in concrete mixing

Nurock Mixers has developed an innovative compact volumetric machine.
February 23, 2012 Read time: 1 min
2382 Nurock Mixers has developed an innovative compact volumetric machine. Called the NUVM1.5, this unit was first seen as a prototype at the 242 INTERMAT show in Paris in 2009 and is now being offered to the market. The NUVM1.5 can mix 1m³ of concrete in under three minutes using its combination of hoppers and hydraulics, while it can also produce screed, mortar or process recycled aggregates with a constant production rate at any cement content. Unlike competing mixers of this size and capacity, it is not a scaled-down derivative of a larger machine according to Nurock. This purpose-designed machine incorporates all the compartments for sand, stone and cement in one main hopper, rather than two, and stores water underneath, reducing its overall footprint by around 25%.

By replacing the chains, sprockets and mechanical components with hydraulics, the unit delivers a higher production rate as well as lower running costs and shorter downtime.

An optional onboard computer holds up to 50 preset mix designs. Highly versatile, the NUVM 1.5 is available in three versions, as a static unit for precast applications, as a trailer-mounted model for on-site use and mounted on a 7.5tonne truck for use in urban areas.

For more information on companies in this article

Related Content

  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • Bell’s new truck offers increased capacity
    April 15, 2016
    A key introduction coming from Bell Equipment is its highly productive, high capacity ADT. The new B60E is intended to compete in the market with smaller rigid haulers and is aimed at use in large quarry applications. Running on twin axles the truck has double tyres at the rear and is powered by an MTU diesel, while it offers a capacity of 60tonnes. Its rear dump body has been designed to be short and square in configuration, unlike conventional ADTs that tend to have longer bodies. The reason for this desi
  • Haver & Boecker makes Hydro-Clean start
    March 9, 2017
    Haver & Boecker, a leading equipment manufacturer and solutions provider in aggregates and mining applications, has launched the skid-mounted Hydro-Clean 1000 Wash Plant as a complete solution.