Skip to main content

Innovation in concrete mixing

Nurock Mixers has developed an innovative compact volumetric machine.
February 23, 2012 Read time: 1 min
2382 Nurock Mixers has developed an innovative compact volumetric machine. Called the NUVM1.5, this unit was first seen as a prototype at the 242 INTERMAT show in Paris in 2009 and is now being offered to the market. The NUVM1.5 can mix 1m³ of concrete in under three minutes using its combination of hoppers and hydraulics, while it can also produce screed, mortar or process recycled aggregates with a constant production rate at any cement content. Unlike competing mixers of this size and capacity, it is not a scaled-down derivative of a larger machine according to Nurock. This purpose-designed machine incorporates all the compartments for sand, stone and cement in one main hopper, rather than two, and stores water underneath, reducing its overall footprint by around 25%.

By replacing the chains, sprockets and mechanical components with hydraulics, the unit delivers a higher production rate as well as lower running costs and shorter downtime.

An optional onboard computer holds up to 50 preset mix designs. Highly versatile, the NUVM 1.5 is available in three versions, as a static unit for precast applications, as a trailer-mounted model for on-site use and mounted on a 7.5tonne truck for use in urban areas.

For more information on companies in this article

Related Content

  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe
  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO
  • Tracked mixer from Prinoth and McNeilus
    February 18, 2021
    Engineers from both manufacturers adapted their equipment for an off-road application.
  • Concrete paving advance in the market
    December 9, 2022
    New concrete paving technology is now coming to market from Wirtgen, with the firm broadening its product range with new and improved models now available