Skip to main content

Concrete additive boosts performance

The new KALMATRON concrete addtitive is said to reduce the risk of problems such as shrinkage cracks, leaking, flaking, slab curling and cracking due to freeze thaw cycles. According to the producer, Kalmatron Corporation, KALMATRON is highly versatile as it is a water reducer, plasticiser, water proofing and shrinkage controlling agent, curing compound, corrosion inhibitor, cement class upgrading and high early strength admixture. The product is said to be simple to use and is added to each batch in dry po
September 27, 2017 Read time: 2 mins
The new KALMATRON concrete addtitive is said to reduce the risk of problems such as shrinkage cracks, leaking, flaking, slab curling and cracking due to freeze thaw cycles.


According to the producer, Kalmatron Corporation, KALMATRON is highly versatile as it is a water reducer, plasticiser, waterproofing and shrinkage controlling agent, curing compound, corrosion inhibitor, cement class upgrading and high early strength admixture. The product is said to be simple to use and is added to each batch in dry powder form, while it can be utilised in pre-cast components as well as shotcrete.

Using it will prevent shrinkage cracks and deliver high resistance to freeze-thaw cycles, as well as making concrete 100% waterproof according to the producer. The product gives a high early strength of up to 60MPa (based on mix design) and is said to be both safe and non-toxic. It can be applied in temperature ranges from -22°C to 40°C and offers a high workability with low slump, while it can also be used for coating metal and concrete surfaces. The product also chemically inhibits the corrosive action of chlorides on reinforcing steel and pre-stressed strands in concrete according to the firm, while no curing is needed and it provides high resistance to chlorine, sea salt, acids and oils.

The product is versatile and can be used in a wide variety of applications including small forms and industrial precast forms, foundation pillars, monolithic slabs, roads, loading docks, yards, airport runways and highways.

Related Content

  • Tough competition in concrete paving market
    February 13, 2012
    One thing is clear in the concrete slipforming sector. This comparatively niche market for equipment is rapidly becoming a good deal more competitive as key manufacturers jostle for position.
  • World growth in geosynthtics set to rise
    February 17, 2012
    With geosynthetics sales set to grow rapidly in the next three years, manufacturers are preparing for the demand. Patrick Smith reports. Global demand for geosynthetics is projected to increase 5.3% annually to 4.7 billion m² in 2013 with countries such as China, India and Russia expected to post the strongest gains through the forecast period. All are building large-scale infrastructure developments and face evolving environmental protection regulations and strict building construction codes.
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau
  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b