Skip to main content

Beton bets on Amman’s CBS 120 SL Elba Concrete Mixing Plant

Ammann has assembled a plant that it says is highly competitive on price and performance for its customer Thomas Beton, a concrete supplier near Hamburg. Thomas Beton is among the leading producers of high-quality ready-mix concrete in northern Germany with daily deliveries to infrastructure sites as well as residential, commercial, industrial and agricultural projects. The new Ammann plant – the ninth Ammann-Elba solution for Beton – means that Beton is strengthening its local physical proximity to cu
May 15, 2019 Read time: 3 mins
Ammann’s CBS 120 SL Elba Concrete Mixing Plant with swivelling hopper and additive storage containers
Ammann has assembled a plant that it says is highly competitive on price and performance for its customer Thomas Beton, a concrete supplier near Hamburg.  


Thomas Beton is among the leading producers of high-quality ready-mix concrete in northern Germany with daily deliveries to infrastructure sites as well as residential, commercial, industrial and agricultural projects. The new 6791 Ammann plant – the ninth Ammann-Elba solution for Beton – means that Beton is strengthening its local physical proximity to customers and construction sites to hone a competitive edge in the concrete market.

Being closer to customers also ensures shorter transportation distances to satisfy environmental concerns. To this end, Thomas Beton now produces concrete at 26 facilities across the German states of Schleswig-Holstein, Hamburg, Bremen and Lower Saxony.

The Ammann CBS 120 SL Elba Concrete-Mixing Plant features a frequency-controlled skip hoist. It offers theoretical output of up to 121m³/hour yet has minimal space requirements. Most of the components are galvanised to ensure maximum protection against corrosion.

Beton opted for the Ammann CEM 2660S Elba Single-Shaft Compulsory Mixer with its double helix. High mixing intensity and fast homogenisation are the hallmarks of the mixer.

“Simple operation and good access for maintenance were key factors in our decision to purchase this plant,” said Rainer Brings, chief executive of Beton.

Due to on-site conditions at Elmshorn, the Ammann CEL 210/6 Elba Linear Storage Bin was lowered by 3m to allow grade-level filling. This eliminated the need for an approach ramp, and additives such as steel fibres are now discharged directly onto the weighing belt at grade level. The opposite filling opening was increased to optimise filling and utilisation of the chamber volume. The segment dosing seals are operated pneumatically and their opening width can be adjusted freely.

“We are also able to handle the production of special concrete varieties and other difficult assignments with the accustomed quality,” said Brings.

Plant specifications were defined quickly and construction started promptly.

In its basic version, the Ammann CBS Elba plant is installed on concrete foundations, but mounting on a steel frame without foundations is equally possible. Chamber walls and partitions are keyed for assembly of the linear batcher. Pre-installation of components such as the skip hoist track and the segment dosing seals saves time on-site.

At winter temperatures, smooth mixing is ensured by the insulated housing together with a hot air/hot water system to heat the aggregates in the linear batcher and the feed water needed for the concrete.

For more information on companies in this article

Related Content

  • Durability is crucial while warm mix technology can help disaster recovery
    February 21, 2013
    Why durability is crucial for both emerging and developed economies, and how warm mix technology can help disaster recovery - Kristina Smith reports. When CORE Construction, a 100% owned Ghanaian company, started working on road construction projects five years ago, it was difficult to source the right bituminous mixes. “In the past, most construction firms had a number of challenges when it came to bituminous works, since the local capacity was not well-developed,” said CORE CEO Frank Lartey. CORE’s soluti
  • A Doosan DX530LC-5 gets its water wings
    January 24, 2019
    German contractor Kieswerke Silzen Peissen has purchased three new Doosan machines for the company’s Silzen-based operations for gravel extraction above and below water. The new machines comprise the Doosan DL420-5 wheeled loader, a custom-made long-reach 60 tonne DX530LC-5 excavator and the state-of-the-art wheeledloader DL420CVT-5, with CVT, denoting a continuously variable transmission. Silzen Peissen’s two plants in Silzen comprise about 70ha of approved mining area, of which around 20ha - called Plan
  • Swell times for swale construction with a Sidewinder
    October 9, 2018
    Specialised swale construction featured in Northern England recently UK contractor Balfour Beatty examined different methods for building swales along the Norwich Northern Distributor Road near the English city of Norwich. Balfour decided to trial specialised road-widening machines, specially configured excavator buckets and modified compaction equipment. Excavators and dump trucks prepared the area for placement of sub-base material. The swale areas were constructed using both conventional methods as wel
  • Repaving Barcelona Airport runway surfaces
    November 8, 2017
    A Spanish contractor has utilised an asphalt plant from Ammann to deliver high-quality material for a key runway at Barcelona Airport. The firm Benito Arnó e Hijos, won the deal to provide asphalt for the reconstruction of the main runway at Barcelona-El Prat Airport. The firm opted to use an Ammann ABT 280 SpeedyBatch plant for the project as this model offered the combination of both mobility and productivity as required. With the short-term nature of the project, a fixed plant would have been unsuitable