Skip to main content

Landmark new UK bridge project

COWI is working on a landmark UK bridge project.
By MJ Woof December 2, 2020 Read time: 2 mins
The Carrington Bridge is the first in the UK to feature a new steel grade - image © courtesy of Alun Griffiths Contractors Ltd
The new Carrington Bridge project in Worcester is the first UK bridge to use a new higher-strength grade of weathering steel. This S460W material offers structural and environmental benefits.

Using this stronger grade of steel enabled the COWI design team to reduce the total material quantity by 15%, resulting in a more sustainable structure. The reduced quantity of steel reduces associated carbon emissions from manufacturing and transport. The use of corrosion-resistant weathering steel means the steelwork does not require painting, a further environmental benefit.

The use of weathering steel also made it easier to transport and lift the girders. These were delivered to site in segments of up to 48m, then spliced into whole-span lengths of 80m before being lifted onto their supports by a 1,200tonne capacity mobile crane, one of the UK’s largest. The final two crane lifts over the River Severn were achieved at a radius of 80m with the crane boom extended to its maximum length of 180m.

COWI won the work on the project with Alun Griffiths Contractors, as part of an ECI scheme, to design the three-span composite road bridge, as well as the geotechnical design of the road embankment, retaining walls and slope stabilisation measures. The bridge has a total length of 205m and forms part of the Worcester Southern Link Road project, which will convert the A4440 from single to dual carriageway, relieving traffic congestion in the area. The steelwork for Carrington Bridge was fabricated and installed by Cleveland Bridge.

The 2.5km long highway scheme includes another significant viaduct as well as a landmark footbridge, also designed by COWI. In addition to designing the structures, COWI was also responsible for all of the geotechnical design of the project, including earthworks. Completion of the bridge is planned for spring 2021.

For more information on companies in this article

Related Content

  • Inter-oceanic Corridor for Brazil-Bolivia-Chile
    March 2, 2015
    A new Bolivian link is playing a key role in a major Latin American highway – Mauro Nogarin reports. Construction of a new route through Bolivia will help deliver improved transport between Latin America’s Pacific and Atlantic coasts. The construction of the highway between Santa Barbara-Caranavi-Quiquibey has been carried out by the consortium ARBOL. This firm is a partnership between the Argentinean company Grupo Eling and Administradora de Caminos Boliviana (ABC). The stretch of highway is an important s
  • High quality geogrid from Fortrac
    September 7, 2021
    Fortrac says that its new T eco product is a high-tensile geogrid made from high-quality PET recycled yarn. Using this geogrid makes building steep slopes and retaining structures from reinforced soil more sustainable according to the firm. The product uses 100% recycled yarn but retains the original fibre quality. This ecoLine version is both economic to buy and uses a sustainable source
  • Auto-Klug is in the groove with a Grove GMK4100L-1 all-terrain
    April 17, 2018
    German crane provider Auto-Klug has taken delivery of a Grove GMK4100L-1 all-terrain crane, the first in the country to come with a K-100 synthetic rope. Made from a combination of high-performance synthetic fibres, the K-100 is 80% lighter than wire rope and boasts torque-neutral construction that eliminates load spin and cabling, according to Grove. The new hoist material also makes for easy handling, reeving and installation, and because it does not require lubrication with heavy grease, it is environm
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.