Skip to main content

Astec developing European facility

Astec Industries is setting up Astec Mobile Machinery, which will be based at Hameln in Germany. The new facility will help the firm's international growth, particularly in Eastern Europe and Russia where the firm already has a strong sales presence and where road construction is strong at present.
May 2, 2012 Read time: 2 mins
681 Astec Industries is setting up Astec Mobile Machinery, which will be based at Hameln in Germany. The new facility will help the firm’s international growth, particularly in Eastern Europe and Russia where the firm already has a strong sales presence and where road construction is strong at present.

The manufacturing and office space is in Hameln, close to Hanover in Lower Saxony. The operation is being staffed by German engineers, service technicians, and sales staff and will serve all of Europe.

1252 Roadtec, part of Astec Industries, will be taking the lead in developing the facility. However the plans call for the location to serve as a European hub for most Astec Industries companies in the future. Roadtec core products are asphalt finishers, cold planers, Shuttle Buggy material transfer devices, soil stabilisers, cold-in-place recycling equipment and self-propelled brooms used in road construction. Among the projects in the works already at Hameln is the development of a tamper bar screed, which will be manufactured at Astec Mobile Machinery Europe from the quarter of 2012. This screed technology will allow Roadtec to begin marketing its pavers in Europe and in other international territories. The facility will stock parts and provide service to the growing Astec Industries European customer base and will be headed by Michael Pottkaemper.

For more information on companies in this article

Related Content

  • Iowa expects longer lasting road surface
    June 9, 2015
    In the US state of Iowa, tough paving specifications are resulting in contractors delivering road surfaces that will last longer. The Iowa Department of Transportation (I-DOT) expects to see a highway road surface last 20 years and recently let the contract for a 25.7km road resurfacing project for Highway 92 between Winterset and Greenfield. The 40km link between the two towns sees an average 1,365 cars/day travel on the highway, which was last worked on in 1994 and its surface was due for replacement.
  • Advanced asphalt plants being developed
    April 7, 2017
    The Fayat Group is developing its asphalt plant range with its Marini-Ermont product offerings - Mike Woof writes The Fayat Group is a major player in the global asphalt plant sector with its Marini and Ermont brands and is further developing both product ranges. The latest machines have been designed to cater to a wide array of customer needs, from large, fixed high-production plants to its compact super portable units, as well as from high sophistication down to more basic technology for developing mar
  • New software makes road marking applications easier
    February 17, 2012
    Equipment, materials and testing combine to offer motorists better road markings as Patrick Smith reports Drivers realise that clear road markings, particularly in darkness and during the wet, are life-savers, offering guidance and direction. Manufacturers of marking materials, in-road studs, and testing and laying equipment have spent years perfecting solutions to make such markings easier to place; easier to see through the use of a variety of materials, and longer lasting. Sophisticated testing equip
  • Milling accurately for construction efficiency
    May 16, 2014
    The two-way flow of machine data is a crucial issue for machine optimisation and new telematics systems are becoming increasingly important in construction Telematics systems can be tapped into by machine control technologies to allow greater integration of the machine as a data provider within an operation. And for certain production machines that feature wear-intensive operation, telematics systems are becoming a vital tool for minimising maintenance costs by scheduling service intervals, maximising u