Skip to main content

Upgrading a Benninghoven asphalt plant with new technology

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.
October 18, 2017 Read time: 2 mins
The Benninghoven asphalt plant upgrade will boost quality and RAP capabilities for the contractor

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities.

To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from 167 Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP).

The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour. It is equipped with a parallel counterflow drum, providing indirect heating of the RAP. This configuration ensures that the bitumen contained within the RAP is not damaged by direct heating. According to the firm, this layout allows higher RAP percentages (as much as 90% is claimed) to be processed in the mix than with conventional plants.

At the same time, the plant also meets the latest German emissions requirements. Asphalt produced by the plant is at a temperature of 160°C, while its efficient operation is said to deliver major savings in fuel consumption. According to Benninghoven, the configuration of the counterflow drum and the indirect hot gas heating system ensures that product quality is maximised while exhaust and heat emissions are minimised, boosting overall efficiency.

In addition to the hot feed system with its parallel drum and hot gas generator, the plant has also been retrofitted with a cold feed system: a multivariable feed hopper for a RAP material rate of up to 40%. Meanwhile, the preliminary batching units and other components from the previous plant were retained.

The plant has an EVO JET 4 combination burner for oil and coal dust delivering 23.7MW. It has a six-level screening system as well as a hot bin section with a capacity of 170tonnes in seven bins and mixed material storage silos holding 420tonnes. Other new components included a full enclosure around the plant, a filler tower and the latest Benninghoven BLS 3000 control system.

For more information on companies in this article

Related Content

  • Asphalt paver offers wheeled or tracked options
    February 27, 2012
    Well known in the compaction field, BOMAG continues to raise its profile in the paving sector with the launch of another new machine, the BF300 paver. This model replaces the earlier Marini-developed BF331 and is said to be a combination of the best German and Italian engineering as well as sharing some features with the BF600 series launched by BOMAG during last year. Developed for the 7-8tonne class the BF300 is versatile and manoeuvrable and has a transport width of just 2.5m, even including its mounted
  • Globecore offers improved bitumen storage
    October 27, 2016
    Improved bitumen storage is claimed for the new SBM-15 tank from GlobeCore. The firm has upgraded its existing design of modified bitumen storage tank to increase capacity, efficiency and versatility. A key feature is the new structural design with its downwards cone-shaped bottom. This is said to solve the problem of heat loss in the lower part of the tank while a minimum 200mm of heat insulation ensures it is thermodynamically efficient. The new model is 500mm shorter, allowing a customer to transport
  • Clean road construction technology is coming from Wirtgen
    May 14, 2025

    Dr Volker Knickel, CEO of the Wirtgen Group said that the firm is working to deliver sustainable and efficient road construction technologies. Warm asphalt plays a key role in sustainable road construction and will grow in use in the next few years. Dr Knickel commented that sustainability will be of increasing importance for contractors, while in Germany there are also stricter regulations on reducing the exposure site personnel to VOCs.

  • Clean road construction technology is coming from Wirtgen
    June 18, 2025
    Wirtgen is introducing advanced technologies that will boost sustainability