Skip to main content

Upgrading a Benninghoven asphalt plant with new technology

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.
October 18, 2017 Read time: 2 mins
The Benninghoven asphalt plant upgrade will boost quality and RAP capabilities for the contractor

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities.

To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from 167 Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP).

The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour. It is equipped with a parallel counterflow drum, providing indirect heating of the RAP. This configuration ensures that the bitumen contained within the RAP is not damaged by direct heating. According to the firm, this layout allows higher RAP percentages (as much as 90% is claimed) to be processed in the mix than with conventional plants.

At the same time, the plant also meets the latest German emissions requirements. Asphalt produced by the plant is at a temperature of 160°C, while its efficient operation is said to deliver major savings in fuel consumption. According to Benninghoven, the configuration of the counterflow drum and the indirect hot gas heating system ensures that product quality is maximised while exhaust and heat emissions are minimised, boosting overall efficiency.

In addition to the hot feed system with its parallel drum and hot gas generator, the plant has also been retrofitted with a cold feed system: a multivariable feed hopper for a RAP material rate of up to 40%. Meanwhile, the preliminary batching units and other components from the previous plant were retained.

The plant has an EVO JET 4 combination burner for oil and coal dust delivering 23.7MW. It has a six-level screening system as well as a hot bin section with a capacity of 170tonnes in seven bins and mixed material storage silos holding 420tonnes. Other new components included a full enclosure around the plant, a filler tower and the latest Benninghoven BLS 3000 control system.

For more information on companies in this article

Related Content

  • Advances in compact compaction and compact loading machines coming to market
    September 11, 2014
    Key developments are being seen in the markets for compact compaction and loading machines - Mike Woof writes Various new utility machines are now coming to market aimed at the rental segment, with advances in small compaction and loading tools proving particularly popular. These will benefit from the latest low emission engines while delivering increased power and performance, as well as being easier and more comfortable to use.
  • Adhesiveness control in asphalt mixes – from the project to production
    September 19, 2019
    Asphalt plant producer Ciber discusses asphalt mix properties The basic quality criterion of an asphalt mix is its adhesiveness; the adhesion capacity among materials. This adhesive capacity of the asphalt mix can be measured in the laboratory through qualitative or quantitative tests. The result of this analysis should be used as a reference for the improvement of the mix. In the laboratory this can be achieved using additives while at the plant it can be achieved using differing mixer technology an
  • Adhesiveness control in asphalt mixes – from the project to production
    September 19, 2019
    Asphalt plant producer Ciber discusses asphalt mix properties The basic quality criterion of an asphalt mix is its adhesiveness; the adhesion capacity among materials. This adhesive capacity of the asphalt mix can be measured in the laboratory through qualitative or quantitative tests. The result of this analysis should be used as a reference for the improvement of the mix. In the laboratory this can be achieved using additives while at the plant it can be achieved using differing mixer technology an
  • Material feeder boosts paving job in South Africa
    December 14, 2017
    The use of a material feeder in a road paving job in South Africa has helped increase productivity and quality on the project. The contractor employed a Vögele MT 3000-2 Offset PowerFeeder to help optimise pavement quality, with the positive paving results having been confirmed by the University of Twente, Netherlands. This body monitored the project from a scientific perspective and its equipment included RoadScan, the innovative temperature-measurement system from Vögele. Using a material feeder can