Skip to main content

Upgrading a Benninghoven asphalt plant with new technology

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.
October 18, 2017 Read time: 2 mins
The Benninghoven asphalt plant upgrade will boost quality and RAP capabilities for the contractor

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities.

To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from 167 Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP).

The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour. It is equipped with a parallel counterflow drum, providing indirect heating of the RAP. This configuration ensures that the bitumen contained within the RAP is not damaged by direct heating. According to the firm, this layout allows higher RAP percentages (as much as 90% is claimed) to be processed in the mix than with conventional plants.

At the same time, the plant also meets the latest German emissions requirements. Asphalt produced by the plant is at a temperature of 160°C, while its efficient operation is said to deliver major savings in fuel consumption. According to Benninghoven, the configuration of the counterflow drum and the indirect hot gas heating system ensures that product quality is maximised while exhaust and heat emissions are minimised, boosting overall efficiency.

In addition to the hot feed system with its parallel drum and hot gas generator, the plant has also been retrofitted with a cold feed system: a multivariable feed hopper for a RAP material rate of up to 40%. Meanwhile, the preliminary batching units and other components from the previous plant were retained.

The plant has an EVO JET 4 combination burner for oil and coal dust delivering 23.7MW. It has a six-level screening system as well as a hot bin section with a capacity of 170tonnes in seven bins and mixed material storage silos holding 420tonnes. Other new components included a full enclosure around the plant, a filler tower and the latest Benninghoven BLS 3000 control system.

For more information on companies in this article

Related Content

  • Emissions regulation leads to efficiency gains
    November 6, 2012
    Innovative technology is use is providing efficient, clean burning engines - Mike Woof reports The development of new diesel engine technology has, for the off-highway equipment sector, been the single most expensive research field for the industry since these machines first started being manufactured. Aimed at reducing the emissions of nitrous oxide as well as particulate matter, in a phased series of stages the engine emission improvements will make major changes to the construction sector. In real world
  • Benninghoven’s revolutionary REVOC technology slashes emissions
    October 26, 2022
    RAP is black gold says Benninghoven, and its innovative REVOC system allows asphalt mixing plant owners to achieve high recycling ratios from existing hot and cold systems while reducing their total carbon emissions (Ctot)...
  • Ammann is widening the range of its Elba concrete plants
    February 10, 2015
    Ammann continues to invest in the Elba concrete plant business it acquired during 2014. Fruit of this can be seen in the expanding product range, with the introduction of the new ECC Elba Concrete Centre.
  • Ammann is widening the range of its Elba concrete plants
    January 6, 2017
    Ammann continues to invest in the Elba concrete plant business it acquired during 2014. Fruit of this can be seen in the expanding product range, with the introduction of the new ECC Elba Concrete Centre.