Skip to main content

Sandvik on drill at the Liantang/Heung Yuen Wai Boundary project

The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems. The US
April 4, 2018 Read time: 4 mins
Sandvik’s Ranger DQ500 was on site and on drilling duty
The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong


There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems.

The US$3.2 billion control point will connect existing expressway systems in Hong Kong and Shenzhen to cut travel time between Hong Kong and eastern Guangdong, as well as southern Fujian and Jiangxi.

Contract 6 involves building a new highway, viaducts and a 700m road tunnel by the end of 2018 at a cost of around $770 million. The work is being done by a joint venture of China Road and Bridge Corp from mainland China, Taiwan’s Continental Engineering and Hong Kong-based Kaden Construction - the CRBC-CEC-Kaden JV.

“We needed surface drill rigs for open cut of the hills by drill and break. Tunneling jumbos for tunnel excavation and then high-quality mobile crushers to crush the excavated rock,” said K Y Chow, construction manager for the joint venture.

For drilling duty, a Ranger DQ500 and a Ranger DX700 were working on site but the joint venture also bought three Ranger DX800 surface drill rigs.

The drill rigs were used for the open cut of the hills by drill and break. Drill and blast was forbidden because blasting was not permitted on the type of hill cut along the highway.

The Ranger DX800, however, proved to be highly suited to the application. One of the new features is the revolving superstructure enabling large drilling coverage from the standard 17.6m² to a US standard 26.4m². When rotating, the rig’s stability is guaranteed because the counterweight remains always on the opposite side of the boom.

The rig also features a THC700 drilling control system that automatically adjusts to changing rock formations. It also sends an optimal amount of power to the rock to ensure smooth rotation, solid rock contact and fast penetration in different rock conditions.

Low fuel consumption is achieved by an ecopackage that includes engine RPM adjustment. Tramming force has been boosted by over 10%, according to 325 Sandvik.

For excavation of the dual two-lane tunnel, Sandvik supplied three DT1230i's and one DT820-SC tunneling jumbos. These were required because each tunnel is 14m wide and 11m high for two lines of traffic on the two main tunnels, along with some small cross passage tunnels. The Sandvik DT1230i is a computer-controlled three-boom electro-hydraulic drilling jumbo for tunneling and cavern excavation of 20 211m² cross sections, including face drilling, bolt hole drilling and mechanised long-hole drilling.

The DT1230i is coupled with the iSURETM tunnel management programme, intelligent iDATA control system, newly-launched high-frequency RD525 drills, robust booms and advanced drill string guides.

Sandvik QJ241 tracked jaw crushers have been crushing excavated granite for the tunnel’s road base. The QJ241 has handled the 600mm feed-size to produce a 250mm product. This is further fed into the second Sandvik QJ241 to produce a 40mm product for tunnel refilling.

The self-propelled QJ241 is Sandvik’s smallest compact tracked jaw crusher. It is fitted with a hydraulic raise-and-lower facility on the main conveyor making it ideal for hard rock applications.

A full service and maintenance agreement was signed between Sandvik and the CRBC-CEC-Kaden JV, as well as Sandvik providing all spare parts, lube and oil.

For more information on companies in this article

Related Content

  • Boom in Morocco's road construction materials
    April 10, 2012
    The strong road construction market in Morocco is helping boost the quarrying market in the country substantially. One such operation exists near the town of Ben Slimane, situated north of Casablanca. Agregat Oued Cherrat (AOC) owns a 65ha quarry, one of the largest of the 14 in the region and when the firm decided to buy new excavators, it also opted to buy Hitachi machines. AOC placed an order for one ZX330-3, with the second delivered three months later and the company now has three ZX330-3s, with a four
  • Asphalt paving innovations coming to market
    May 24, 2019
    Asphalt paver manufacturers are introducing new models, many of which are aimed at specific market needs – Mike Woof writes A range of new asphalt paver models are coming to market, with some having been developed specifically for certain markets. China’s demand for construction equipment has resulted in numerous firms developing machines just for this market for example. Customers in China have long favoured the European-style machines, featuring tamper bar screeds, over the machines with vibrating
  • US asphalt and quarry show highlights new technology
    May 8, 2015
    New technology was one key focus area for the World of Asphalt/AGG1 event run recently in the US city of Baltimore - Mike Woof writes Technology has been a major focus for the combined World of Asphalt and AGG1 2015 exhibition and conference held in Baltimore. The exhibition area attracted 450 exhibitors and covered a larger area than for previous events, while over 10,000 education season tickets were bought by those wanting to attend the presentation sessions. The event was held from March 17th- March
  • Iceland has opened its longest tunnel, the Norðfjarðargöng tunnel on Route 92
    November 14, 2017
    Iceland has opened its longest tunnel, a 7.9km structure between Neskaupstaður and Eskifjörður, to replace a mountain road often closed during winter storms. Construction of the Norðfjarðargöng tunnel on Route 92 in eastern Iceland started in 2013 and has cost just over €118 million. Tunneling, done using the traditional Nordic drill and blast method, was finished in 2015. The the two-lane Norðfjarðargöng tunnel replaces a smaller tunnel, the 640m Oddsskarðsgöng tunnel, a single-lane structure where cars