Skip to main content

Rockster machines operating in Tanzania extraction operation

Rockster’s DUPLEX System is being used in an extraction operation in Tanzania. The PB Mining Company in Tanzania selected Rockster’s 2-in-1 machine for crushing highly abrasive rock. The extraction firm was formed in 2014 and specialises in the exploration of lead glance, named Galena, the natural mineral form of lead sulphide. This is the most important ore of lead and usually contains about 1–2% silver, a byproduct that far outweighs the main lead ore in revenue. Because of its low melting point, it is e
May 14, 2018 Read time: 3 mins
The Rockster Jaw Crusher R800 crushes lead ore in Chunya to a size of 0-40 mm using screenbox and return belt
Rockster’s DUPLEX System is being used in an extraction operation in Tanzania. The PB Mining Company in Tanzania selected Rockster’s 2-in-1 machine for crushing highly abrasive rock.


The extraction firm was formed in 2014 and specialises in the exploration of lead glance, named Galena, the natural mineral form of lead sulphide. This is the most important ore of lead and usually contains about 1–2% silver, a byproduct that far outweighs the main lead ore in revenue. Because of its low melting point, it is easy to liberate by smelting.

The company has many different sites in the Mbeya Region in the United Republic of Tanzania, working in a territory of about 80km2. Exploration works are carried out by excavation as well as using vertical and inclined prospecting drilling, a driving of trenches, vertical and inclined holes.

One of the sites is located near Chunya in Tanzania’s Mbeya Region. The firm started to work at the site in May 2017 first excavating the upper layers of the soil and taking out the first samples of ore for analysis. After positive results of the geological tests the firm started its main extraction operation.

The firm brought in the 8790 Rockster R800 jaw crusher to crush the Galena to a fraction of 0-40mm. To define this final grain size, the firm use an RS83 screenbox with an RB75 return belt on the crushing plant. After that the firm changes the crushing units and continues crushing the 0-40mm material with the impact crusher R900 to a fraction of 0-5 mm. This material is sent to a leaching company to separate the pure ore which is then used for the production of concentrates based on polymetallic ores.

Rockster sales representative Maksim Perminov commissioned the machine and did the training and instruction at the customer’s site in Tanzania. He said, “After finding out the requirements of the PB Mining Company I was sure that the Rockster Duplex-System would be the best solution to receive the final grain quality they need with the lowest costs possible. The uniformity of the ore mass is very important for them. As the Galena rock has a very high abrasiveness, it requires a primary crushing on the jaw crusher to reduce the wear of blow bars when working on a rotary crusher.”

The PB Mining Company’s 2-in-1 crushing plant has proven successful in producing the necessary 0-5mm final grain. Using this equipment has done away with the need for purchasing, maintaining and transporting separate crushers. By using the jaw as primary crusher the firm saves wear and maintenance costs. The secondary impact crusher also delivers a good product shape and quality, allowing the firm to crush the Galena in the most ecological and cost efficient way.

For more information on companies in this article

Related Content

  • World growth in geosynthtics set to rise
    February 17, 2012
    With geosynthetics sales set to grow rapidly in the next three years, manufacturers are preparing for the demand. Patrick Smith reports. Global demand for geosynthetics is projected to increase 5.3% annually to 4.7 billion m² in 2013 with countries such as China, India and Russia expected to post the strongest gains through the forecast period. All are building large-scale infrastructure developments and face evolving environmental protection regulations and strict building construction codes.
  • Sandvik’s DT1131i jumbo and iSURE software in Iceland and Norway
    August 14, 2019
    Sandvik’s DT1131i three-boom, electro-hydraulic jumbo, iSURE tunnel management software and the latest drill bit hardware were recently put to the test in Iceland and Norway* Czech contractor Metrostav recently achieved 105m of tunnel excavation in a record-breaking six days. But it will be consistent performance and progress that will see Iceland’s Dyrafjordurgong Tunnel in the remote Westfjords region open on time and on budget. The 5.3km Dyrafjordurgong Tunnel is costing around €69 million and due
  • Saudi Arabia limestone production boost
    October 23, 2017
    Saudi Dolomite runs a processing plant in Abqaiq, which is located in the desert, 80km south-west of the capital of the eastern province of Saudi Arabia, Damman. Covering an area of 250,000m², the plant processes 5,000tonnes of material/day and runs its around-the-clock operation seven days/week.
  • Benninghoven unveils an alternating chute for Eco asphalt plant
    April 23, 2018
    Benninghoven has launched a cost-efficient alternating chute unit on its ECO asphalt mixing plant. The type ECO asphalt mixing plant range offers outputs from 100tonnes/hour to 320tonnes/hour to ensure maximum mobility and flexibility. The machines can be operated as stationary plant but the can also handle fast location changes without problems, according to Benninghoven. Benninghoven has always relied on loading skip technology as the link between mixer and loading silo. When working like this, the