Skip to main content

Rockster machines operating in Tanzania extraction operation

Rockster’s DUPLEX System is being used in an extraction operation in Tanzania. The PB Mining Company in Tanzania selected Rockster’s 2-in-1 machine for crushing highly abrasive rock. The extraction firm was formed in 2014 and specialises in the exploration of lead glance, named Galena, the natural mineral form of lead sulphide. This is the most important ore of lead and usually contains about 1–2% silver, a byproduct that far outweighs the main lead ore in revenue. Because of its low melting point, it is e
May 14, 2018 Read time: 3 mins
The Rockster Jaw Crusher R800 crushes lead ore in Chunya to a size of 0-40 mm using screenbox and return belt
Rockster’s DUPLEX System is being used in an extraction operation in Tanzania. The PB Mining Company in Tanzania selected Rockster’s 2-in-1 machine for crushing highly abrasive rock.


The extraction firm was formed in 2014 and specialises in the exploration of lead glance, named Galena, the natural mineral form of lead sulphide. This is the most important ore of lead and usually contains about 1–2% silver, a byproduct that far outweighs the main lead ore in revenue. Because of its low melting point, it is easy to liberate by smelting.

The company has many different sites in the Mbeya Region in the United Republic of Tanzania, working in a territory of about 80km2. Exploration works are carried out by excavation as well as using vertical and inclined prospecting drilling, a driving of trenches, vertical and inclined holes.

One of the sites is located near Chunya in Tanzania’s Mbeya Region. The firm started to work at the site in May 2017 first excavating the upper layers of the soil and taking out the first samples of ore for analysis. After positive results of the geological tests the firm started its main extraction operation.

The firm brought in the 8790 Rockster R800 jaw crusher to crush the Galena to a fraction of 0-40mm. To define this final grain size, the firm use an RS83 screenbox with an RB75 return belt on the crushing plant. After that the firm changes the crushing units and continues crushing the 0-40mm material with the impact crusher R900 to a fraction of 0-5 mm. This material is sent to a leaching company to separate the pure ore which is then used for the production of concentrates based on polymetallic ores.

Rockster sales representative Maksim Perminov commissioned the machine and did the training and instruction at the customer’s site in Tanzania. He said, “After finding out the requirements of the PB Mining Company I was sure that the Rockster Duplex-System would be the best solution to receive the final grain quality they need with the lowest costs possible. The uniformity of the ore mass is very important for them. As the Galena rock has a very high abrasiveness, it requires a primary crushing on the jaw crusher to reduce the wear of blow bars when working on a rotary crusher.”

The PB Mining Company’s 2-in-1 crushing plant has proven successful in producing the necessary 0-5mm final grain. Using this equipment has done away with the need for purchasing, maintaining and transporting separate crushers. By using the jaw as primary crusher the firm saves wear and maintenance costs. The secondary impact crusher also delivers a good product shape and quality, allowing the firm to crush the Galena in the most ecological and cost efficient way.

For more information on companies in this article

Related Content

  • Hargreaves takes full Cat fleet
    November 12, 2012
    Hargreaves has made history by becoming the first mining project in Europe, Africa and the Middle East to invest in a total solution from the newly extended Caterpillar mining range. The seven year US$94.02million (£60mn) deal with Finning Equipment Solutions includes four new Cat 6030 hydraulic excavators and 19 777 Off Highway trucks, delivered earlier this year to the new Hargreaves’ Surface Mining Division for use at the Tower Colliery open cast mine site in Hirwaun, Rhondda Cynon Taff, South Wales. Fol
  • High performance pavers build high performance track
    February 29, 2012
    Work on the new Formula 1 racing circuit in Abu Dhabi is progressing at high speed. Over 6,000 construction personnel are working in the United Arab Emirates (UAE) to complete the new high-speed circuit and its infrastructure. German contractor Bickhardt-Bau is carrying out the paving work, using a fleet of new Vögele pavers and Hamm compaction rollers.
  • Hargreaves make history with US$94.02mn Cat fleet deal
    June 22, 2012
    Hargreaves has made history by becoming the first mining project in Europe, Africa and the Middle East to invest in a total solution from the newly extended Caterpillar mining range. The seven year US$94.02million (£60mn) deal with Finning Equipment Solutions includes four new Cat 6030 hydraulic excavators and 19 777 Off Highway trucks, delivered earlier this year to the new Hargreaves’ Surface Mining Division for use at the Tower Colliery open cast mine site in Hirwaun, Rhondda Cynon Taff, South Wales.
  • Testing time for Tlicho all-season gravel road in Canadian north
    January 27, 2020
    Contractors on the 97km Tlicho all-season gravel road in Canada’s far north are on site despite not having all proper approvals, according to Canadian media.