Skip to main content

Retexturing crucial UK route

Contractor Balfour Beatty Mott MacDonald has used Klaruw’s advanced longitudinal grooving system, GrooveTex, to retexture sections of concrete surface on the M20 in the UK. The GrooveTex system improves and restores surface skid resistance by creating micro longitudinal grooves using closely spaced diamond-tipped saw blades at a predetermined width and depth. While being based on proven diamond-grinding techniques, Klaruw’s system is said to be optimised to provide significant improvements.
July 21, 2015 Read time: 2 mins
Klaruw’s new grooving system has been used in the UK to improve skid resistance and boost safety for drivers

Contractor 1530 Balfour Beatty Mott MacDonald has used Klaruw’s advanced longitudinal grooving system, GrooveTex, to retexture sections of concrete surface on the M20 in the UK.
 The GrooveTex system improves and restores surface skid resistance by creating micro longitudinal grooves using closely spaced diamond-tipped saw blades at a predetermined width and depth.  While being based on proven diamond-grinding techniques, 2311 Klaruw’s system is said to be optimised to provide significant improvements.

Unlike traditional grinding systems, GrooveTex adjusts to and follows the profile of the surface. The surface levels after treatment remain the same as the surrounding surface, avoiding the need for removal and reinstatement of road markings, road studs or ironwork.

Productivity is also said to be higher, as the machine has a retexturing width of 2m, said to be the widest of any unit available at present. A full lane width can be treated in a single pass using two GrooveTex machines in echelon.  The benefits mean that the GrooveTex treatment is less costly than competing systems, according to Klaruw.

The technology has been tested successfully on the M20 and is likely to be used elsewhere in the UK, to boost safety for drivers. Unaffected by wet weather, Klaruw successfully completed the GrooveTex treatment within the specified timeframe and with minimal disruption to motorway users. The system also has the potential to reduce road/tyre noise levels generated by concrete.

For more information on companies in this article

Related Content

  • Engine firms delivering innovative solutions for reducing emissions and fuel consumption
    January 6, 2017
    Solutions for Tier 4 Final emissions regulations dominated Conexpo 2014, with many firms showing off their options of DOC, DPF and SCR after-treatments. Deutz, while staying with an SCR-only solution, took a more unusual approach on its high horsepower V6 12litre and V8 16litre engines. Both get a dual SCR after treatment system to meet Tier 4 Final emission standards.
  • Engine firms delivering innovative solutions for reducing emissions and fuel consumption
    March 8, 2014
    Solutions for Tier 4 Final emissions regulations dominated Conexpo 2014, with many firms showing off their options of DOC, DPF and SCR after-treatments. Deutz, while staying with an SCR-only solution, took a more unusual approach on its high horsepower V6 12litre and V8 16litre engines. Both get a dual SCR after treatment system to meet Tier 4 Final emission standards.
  • Key innovations in engines and drivelines technology at Conexpo 2014
    April 22, 2014
    Engines and drivelines technologies have move forward, as could be seen at Conexpo 2014 - Geoff Ascroft reports Solutions for Tier 4 Final emissions regulations dominated Conexpo 2014, with many firms showing off their options of DOC, DPF and SCR after-treatments. Deutz, while staying with an SCR-only solution, took a more unusual approach on its high horsepower V6 12litre and V8 16litre engines. Both get a dual SCR after treatment system to meet Tier 4 Final emission standards. Using a dual SCR system,
  • Brazil roads repaired with Wirtgen equipment
    November 6, 2018
    A large milling machine from Wirtgen has been used to help repair busy roads in the vicinity of São Paulo in Brazil. The roads provide important transport connections as they link São Paulo with Santos, Brazil’s largest port. The Anchieta-Imigrantes highway system provides the main link between the metropolitan region of São Paulo and the port of Santos, the busiest port in Latin America. Construction of the Anchieta highway began in 1947, with Imigrantes following at the start of the 1970s. Today the Anch