Skip to main content

Pervious concrete improves storm water drainage

MINNESOTA CITIES including Minneapolis and Richfield have been testing pervious concrete on parking lots and other hard surfaces to improve storm water management. In Shoreview MN, the authorities went a stage further by opting to replace a storm drainage system with pervious concrete.
April 10, 2012 Read time: 2 mins
North County Concrete set up its Allen Triple Roller Tube Paver to pave the full width streets in one pass
MINNESOTA CITIES including Minneapolis and Richfield have been testing pervious concrete on parking lots and other hard surfaces to improve storm water management. In Shoreview MN, the authorities went a stage further by opting to replace a storm drainage system with pervious concrete. The project includes the reconstruction of five streets in the Woodbridge neighbourhood totalling around 1.6km of pervious concrete streets. Local firm 1230 Cemstone supplied the 1,412m3 of pervious concrete for this project. The pervious concrete was paved 178mm thick and 6.4m wide between two surmountable kerbs. The pervious concrete was placed over 457mm of crushed aggregate base which will allow the storm water to drain through the pervious concrete and filter through the aggregate before re-entering the soil beneath. The job was awarded to North Country Concrete, which decided to use an Allen Model 255CD Triple Roller Tube Paver from 156 Allen Engineering. The paver has a strike-off tube that continuously pushes the excess concrete in front of the machine and two full length drive roller tubes for compaction. The strike-off tube has a vertical adjustment which was set at 19mm above finish grade and the contractor explained that this allowed the machine to achieve high compaction, boosting the durability of the pavement.

For more information on companies in this article

Related Content

  • New asphalt pavers deliver better surface quality
    February 13, 2012
    Progressive paving improvements are offering better surface quality
  • Wirtgen slipform paver works in Brazil road contract
    May 15, 2015
    Local contractor Galvão Engenharia opted to use an SP 850 slipform paver from Wirtgen as one of the key machines in the job to upgrade and improve the Anel Viário de Fortaleza. This important highway connects Fortaleza, located in the federal state of Ceará, with the busy port of Pecém. The deepwater port in Pecém is some 60km from Fortaleza and since it was inaugurated in 2002, the city has become a primary port for exporting fruit products in refrigerated containers. Fuel and liquefied gas, fertilizer
  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v