Skip to main content

New concrete pumps from Liebherr

Liebherr Concrete Technology is now offering the THP 80-LP truck mounted concrete city pump for the North American market. The THP 80-LP is the smallest in Liebherr’s truck mounted pump product range.
June 9, 2022 Read time: 2 mins
Liebherr is now offering a compact concrete pump for the US market

Despite the compact dimensions, the firm claims that the machine offers same high performance and many of the same features as the larger truck mounted concrete pumps. It suits jobs in urban environments, residential jobs and compact job sites where space is limited.

Liebherr’s new city pump is said to meet a need for a reliable and flexible boom less pump truck for line pumping applications. The design and development of the THP80-LP city pump is a result of customer feedback in collaboration with Liebherr’s many years of engineering and production. The City pump features a 600litre capacity hopper, as well as compact construction and low weight.

The THP 80-LP offers greater flexibility and mobility to maneuverer around the job site. The total length of the new Liebherr city pump is around 8.66m. It is quick to set up and easy to control with an HBC option for the remote control. The truck has storage for the concrete tubes and accessories on the deck and contains plastic water tanks for saving weight. The THP 80-LP is mounted on a two axle truck chassis and weighs around 10.4tonnes. which is lighter than the truck mounted boom pumps.

The pumping kit features an open loop hydraulic circuit that is said to be simple, reliable and powerful. This system provides high performance and has low maintenance costs. The suction inlet has a greater diameter than the cylinder itself, ensuring high suction performance, even on extreme concrete types. With the split wear plates, maintenance can be carried out quickly and easily. In addition, Liebherr offers a pumping kit option that allows high pressure application for extreme tasks. Operators can switch the hydraulic hoses on the pumping kit, allowing the machine to provide higher pressure on the concrete. This pump the provides the standard hydraulic mounting with concrete pressure at cylinder rod side is 75bar, when switching connection, the concrete pressure at cylinder piston side is 125bar.

For more information on companies in this article

Related Content

  • Doosan introduces its new power generation
    January 6, 2017
    From the construction site, to the concert stage, to the front lines of disaster relief efforts, the new EU Stage IIIA engine emission compliant generators from Doosan Portable Power are said to offer customers, including rental companies, contractors and event organisers, robustness, reliability and high performance. The G80-IIIA (80kVA prime power) and G100-IIIA (100 kVA prime power) generators are said to share a similar design and characteristics to the larger G150-IIIA and G200-IIIA models launched in
  • Doosan introduces its new power generation
    February 7, 2013
    From the construction site, to the concert stage, to the front lines of disaster relief efforts, the new EU Stage IIIA engine emission compliant generators from Doosan Portable Power are said to offer customers, including rental companies, contractors and event organisers, robustness, reliability and high performance. The G80-IIIA (80kVA prime power) and G100-IIIA (100 kVA prime power) generators are said to share a similar design and characteristics to the larger G150-IIIA and G200-IIIA models launched in
  • The concrete plan for drilling
    July 9, 2018
    Four tips for optimising concrete dowel drill performance - *Rick Walstad, E-Z Drill Inc president and CEO
  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.