Skip to main content

Accurate concrete paving with Wirtgen

January 7, 2024 Read time: 3 mins
Using stringless controls boost productivity as well as quality

Wirtgen’s improved stringless concrete paving system is being used on the A43 highway near Münster in Germany. 
The AutoPilot 2.0 is a 3D control system that helps increase efficiency and safety. The system is being used to deliver a new poured in-place concrete safety barrier that will separate the eastbound and westbound lanes of the A 43 Autobahn.

Reinforced concrete barriers offer effective vehicle restraint for road sections carrying heavy traffic and the barrier profile was paved by an SP 25i using slipform paving. The use of AutoPilot 2.0 eliminated the need for the paving crew from VSB infra to set up a stringline for controlling the machine.

The automatic 3D control system can optimise slipform paving, allowing accurate stringless control of slipform pavers. It consists of a control system integrated in the machine, a base station and a tablet computer that can be used together with the Field Rover survey pole and on the slipform paver. The system eliminates the need to set up and remove a stringline for conventional machine control, it also reduces project times and costs. The machine is guided by satellite-aided navigation, speeding the workflow and making the operation more efficient, while also allowing tight turns or more complex geometries to be slipformed.

‘This is another project on which we are using stringless paving. We have been using the AutoPilot system since it came onto the market. It saves us so much time that we use it on both of our machines whenever we can.’ said Kay Petersen, CEO of VSB infra.

The working area on this job offers little room for the paving crew and using a stringline would limit this space more. Having more space in front of the slipformer allows mixer trucks to manoeuvre right up to the paver to deliver each load. The absence of the vulnerable stringline also removes the risk of tripping and injuries as a result of falls.

The screen of the AutoPilot tablet displays the course of the virtual stringline and provides information to the operator as the machine moves along the predefined track. The  AutoPilot 2.0 3D control system can be used to produce an array of offset and inset profiles. There is no longer a need for a surveyor to generate a geodetic data model in advance. If a 3D data model already exists, it can be uploaded from the tablet and integrated into the system.

The AutoPilot comes into play before the actual paving work begins. Relevant points on the project site are recorded with the Field Rover survey pole and are used for the digital data model that generates the virtual stringline on the tablet computer. This eliminates the need for an additional surveyor onsite.

The existing sub-base of the A 43 was sampled by an ultrasonic sensor and also used as a reference datum by the machine control system, delivering precise paving of the concrete profile.

Wirtgen
www.wirtgen.com

For more information on companies in this article

Related Content

  • Italy’s renaissance bridge
    July 21, 2020
    Italian consulting company Italferr created a digital twin for designing the new Genoa bridge and won accolades at Bentley Systems: Bentley Year in Infrastructure Awards
  • Smartphone solutions assure paving quality at a lofty height
    April 1, 2022
    Road construction project with digital documentation and temperature monitoring by Vögele
  • Piling rig control system from Trimble
    December 29, 2022
    Trimble is offering machine control options for piling and drilling machines from ABI Maschinenfabrik und Vertriebsgesellschaft as well as Junttan.
  • G&Z paving Canada’s longest runway
    October 12, 2012
    A contractor in Canada, Dufferin Construction, is using three items of new equipment bought from Guntert & Zimmerman to pave the country’s longest runway. The project is extensive, featuring a new runway measuring 4.3km long by 60m wide, an apron area measuring 145,000m2 and two taxiways, each 3.8km long by 25m wide. In all, the work requires 1.5 million tonnes of base aggregate, and 200,000m2 of cement-stabilised base. Dufferin Construction Company, a division of Holcim (Canada) already owns two other G&Z