Skip to main content

Egypt’s new concrete highway connecting Cairo with Sues

CEMEX has played a key role in a highway construction job in Egypt. The company has supplied 130,000m3 of concrete that has been used for the construction of the new Cairo–Suez highway project. The project is of note as this is Egypt’s first concrete highway and if it proves successful, more are likely to be built using this construction method. The 35km road is of major importance to Egypt also as it connects the capital, Cairo, with the seaport city of Suez, two of the nation’s most important economic cen
July 15, 2016 Read time: 1 min


Related Content

  • Smoothing concrete for airport runway
    July 28, 2015
    A contractor in the US is now using a piece of equipment for a specific application on a project at Dallas Fort Worth (DFW) Airport. The job required equipment able to deliver high quality to meet tough client requirements, so the contractor decided to use s 255CD Triple Roller Tube Paver from Allen Engineering.
  • New Mexican highway – completion due
    June 13, 2022
    Completion is due for a new Mexican highway.
  • Concrete paving market developments
    February 9, 2018
    Key developments are being seen in the concrete paving and slipforming market - Mike Woof writes. Key changes are taking place in the concrete paving and slipforming sector, with two of the well-known names in the market recently having changed hands. Both Miller Formless and Power Curbers/Power Pavers have recently been acquired from the families that set up these firms. In both instances the owners of the companies decided to retire and opted to sell these specialised businesses to suitable parties.
  • Concrete runway paving in the US
    December 15, 2017
    A new Wirtgen SP 94i slipform paver has helped deliver the successful reconstruction of a runway in the US state of Missouri. With more than 30,000 take-offs and landings a year, Jefferson City Memorial Airport (JEF) is one of the most heavily frequented airports in Missouri. Thousands of visitors travel through it every day on their way to the government and congress offices in the state capital on the Missouri River. At the end of April 2016, work commenced on the reconstruction of a runway approximately