Skip to main content

Egypt’s new concrete highway connecting Cairo with Sues

CEMEX has played a key role in a highway construction job in Egypt. The company has supplied 130,000m3 of concrete that has been used for the construction of the new Cairo–Suez highway project. The project is of note as this is Egypt’s first concrete highway and if it proves successful, more are likely to be built using this construction method. The 35km road is of major importance to Egypt also as it connects the capital, Cairo, with the seaport city of Suez, two of the nation’s most important economic cen
July 15, 2016 Read time: 1 min


Related Content

  • Concrete paving in Iceland
    October 3, 2022
    High-quality concrete paving has been achieved at an airport in Iceland by specialist contractor, HIB Iceland.
  • Productive concrete pumping
    July 17, 2012
    Compact and easy to transport, the Booster 15 concrete pump from IMER can deliver material with aggregate sizes of up to 25mm and at pressures of up to 70bars. This hydraulic control, two-piston pump is offered in two different basic versions, one aimed at shotcreting applications and the other designed for use on compact sites for concrete pumping duties. Power comes from a low emission, low noise Lombardini diesel A range of standard features are fitted including a 12V electro-vibrator, cable remote contr
  • Concrete barrier challenge
    February 15, 2012
    The 5700C-Max unit from Power Curbers has now been used on a tricky shoulder widening job in New South Wales, Australia. The machine carried out the job close to Robertson in the Southern Highlands, about 1.5 hours drive to the south of Sydney. The job required the construction of a 200m long section of barrier, built to the requirements of the Roads and Traffic Authority (RTA). The contractor hand-formed the concrete shoulder as it was about 3m wide at the start and narrowed down to 1m at the end.
  • Concrete barrier challenge
    April 11, 2012
    The 5700C-Max unit from Power Curbers has now been used on a tricky shoulder widening job in New South Wales, Australia. The machine carried out the job close to Robertson in the Southern Highlands, about 1.5 hours drive to the south of Sydney. The job required the construction of a 200m long section of barrier, built to the requirements of the Roads and Traffic Authority (RTA). The contractor hand-formed the concrete shoulder as it was about 3m wide at the start and narrowed down to 1m at the end.