Skip to main content

Brazil's flood damage

Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding.
February 23, 2012 Read time: 1 min
Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding. In all 185 bridges and five roads will have to be repaired or rebuilt, with the work expected to cost in the region of US$237.6 million. Severe weather conditions caused the flooding, which was particularly heavy in in the hilly regions of Nova Friburgo, Teresopolis, Sumidouro, Petropolis, Bom Jardim, Sao Jose do Vale do Rio Preto and Areal. Of the funding allotted to the work around $177.4 million will be needed for bridge rebuilding, with some $66.2 million needed for road repairs. Many bridges suffered severe scour due to the flooding, resulting in structural problems as well as a number of collapses.

Related Content

  • Costa Rica concrete repairs
    February 15, 2012
    Work has started on the long awaited San Jose-Caldera Highway in Costa Rica, following numerous delays and setbacks. The new 77.5km highway will be used daily by more than 81,000 vehicles, reducing the travel time between the Central Valley and the Central Pacific Coast by at least 30 minutes.
  • Brazil highway concessions in renegotiation
    October 25, 2017
    Two firms holding concessions for major highways in Brazil are asking the government for the terms to be renegotiated. Odebrecht Transport and Triunfo Participacoes e Investimentos are looking to join a new concession renegotiation scheme.
  • High-tech, high places: 3M in US and MetService in New Zealand
    August 1, 2017
    The US state of Michigan sets up a high-tech test road while New Zealand’s transport officials buy in some high-tech weather forecasting. The road safety division of 3M will provide the US state of Michigan with lane markings and retroreflective signs for a connected vehicle technologies trial along the I-75 highway. Around 5km of the Interstate 75 work zone in Oakland County will be transformed over the next four months to improve safety for drivers and test advanced vehicle-to-infrastructure technologie
  • Half Ukraine’s roads ‘poor’
    July 3, 2012
    Official estimates suggest that 70% of Ukraine’s highways require capital repairs. Meanwhile, 50% of the country’s highways (80,000km) of highways are in a poor condition. Roads have been made worse by recent bad winter weather. According to Ukraine’s state body Ukravtodor, traffic volumes have also increased 5%/year for the last five years, making the problem worse. And Ukravtodor says that repairs to Ukrainian highways will cost not less than €59.5 billion. Meanwhile Ukraine’s design institute Kievsoyuzdo