Skip to main content

Brazil's flood damage

Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding.
February 23, 2012 Read time: 1 min
Major repairs are required to roads and bridges in Brazil's Rio de Janeiro State following the recent spate of flooding. In all 185 bridges and five roads will have to be repaired or rebuilt, with the work expected to cost in the region of US$237.6 million. Severe weather conditions caused the flooding, which was particularly heavy in in the hilly regions of Nova Friburgo, Teresopolis, Sumidouro, Petropolis, Bom Jardim, Sao Jose do Vale do Rio Preto and Areal. Of the funding allotted to the work around $177.4 million will be needed for bridge rebuilding, with some $66.2 million needed for road repairs. Many bridges suffered severe scour due to the flooding, resulting in structural problems as well as a number of collapses.

Related Content

  • ARTBA sees growth for US transport construction
    December 5, 2017
    Steady growth in the US market for transport infrastructure construction in 2018. This prediction comes from a new report by the American Road & Transportation Builders Association (ARTBA). The report suggests that the US transportation infrastructure market will rebound slightly next year, following a 2.8% drop in 2017.
  • Sheep in the city
    May 22, 2019
    Christmas follies Christmas congestion was caused in Cambridgeshire due to an errant Santa. Traffic was forced to halt on a busy stretch of road in the town of Wisbech after an inflatable Santa was blown from the house where it had been secured. The giant Santa inflatable came to rest on Cromwell road, lying on its side and appearing to wave drunkenly at vehicles passing in the opposite lane. Two men then managed to remove the giant inflatable from the roadway, allowing vehicles to pass. And an overze
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.
  • Deciding whether to buy new or used equipment
    May 20, 2015
    Customers can face the choice of buying used or new equipment – Dan Gilkes writes. The decision to buy either new or used equipment is almost as old as the construction plant market itself. However some of the reasons for choosing between the two might well be changing, to meet new demands from customers across the world and to cope with a changing supply base. Ever more stringent emissions legislation in Europe, the US and Japan, rapidly developing emerging markets that want the productivity of the latest