Skip to main content

Newly constructed low-noise asphalt surface fails

Questions are being asked over the construction of a new section of the A1 autobahn in Germany. The highway stretch is being scrutinised due to surface failures and lies close to the city of Bremen but has been open for less than three months.
May 15, 2012 Read time: 1 min
Questions are being asked over the construction of a new section of the A1 autobahn in Germany.

The highway stretch is being scrutinised due to surface failures and lies close to the city of Bremen but has been open for less than three months.

The road carries around 70,000 vehicles/day and its construction was intended to reduce congestion between the port cities of Hamburg and Bremen. Numerous potholes are reported to have appeared in the surface of the highway. Given the recent severe weather, failures of older road surfaces are expected but these problems should not occur on links that have been so recently completed.

The investigations will focus on how water penetration into joints could have already caused the freeze-thaw process to break up the running surface or whether other problems such as material segregation or incorrect mix design could have been factors. The low-noise asphalt surface is crumbling at various points along the 73km section recently opened.

Related Content

  • Interstate bridge collapse in Washington State
    May 24, 2013
    A section of bridge carrying Interstate 5 over the Skagit River in the US has collapsed, dumping a number of vehicles into the river, although no fatalities have been reported. The four lane highway bridge lies around 100km north of Seattle in the Pacific North Western state of Washington and provides a key link with neighbouring Canada. The collapse means that traffic between the US and Canada has been disrupted until repairs can be made or a temporary replacement put in place. There is another bridge runn
  • Reducing asphalt plant downtime
    December 12, 2018
    How asphalt plant control add-ons make operation easier while reducing costly downtime - *Carlos Cardenas The word downtime might as well be a curse word in the asphalt production industry. As any operator will say, unplanned plant shutdowns can end up costing a producer heavily in lost production, not to mention a line of unhappy truck drivers and asphalt customers. The key is to get ahead of the problem and spot issues before they skyrocket in severity. Fortunately, some asphalt plant manufacturers offe
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • Machine control boosting paving quality
    April 27, 2015
    The use of machine control technology on a bypass construction job has boosted quality quality control is a topic that clients as well as contractors are finding increasingly important. Control systems are being used more and more often on construction sites as a result, so as to collect data on a range of processes. This includes looking at the asphalt being supplied to site and on the quality of paving during construction. Using this data, processes can be optimised in the medium-term and, in the long-ter