Skip to main content

Removing runway rubber

When Dubai Airport contacted Waterblasting Technologies it faced a number of challenges.
February 20, 2012 Read time: 2 mins
When Dubai Airport contacted Waterblasting Technologies it faced a number of challenges.

One was finding a waterblasting system that would operate successfully in the 42º-52ºC daylight heat of the summer and also to find the fastest and most productive waterblasting system because of very limited runway closure time.

Chemicals, shotblasting and other waterblasting equipment had been tried on the runways, but eventually engineers and management chose the Stripe Hog SH8000T manufactured by 362 Waterblasting Technologies.

The system, which can be built on a variety of truck chassis, uses needle sharp water jets to quickly remove all types of roadway and airfield marking paint as well as runway rubber deposit build-up.

According to the company the Dubai airport runways is probably the most challenging rubber removal environment in the world with an average of 800-plus movements a day with summer-time peaks of 1,100/day and an average of only 5-10 days of rain each year.

"With the ability to remove runway rubber deposits on average of 1,672m²/hour and the ability to operate in the extreme heat without breaking down, the SH8000T became the product of choice for the Dubai airport," says Waterblasting Technologies, which also offers the SH8000T or the new SH8000R with optional, on-board water recycling.

For more information on companies in this article

Related Content

  • Road recycling in Denmark
    May 13, 2024
    A novel approach to road refurbishment has saved time, money and carbon emissions in Denmark, while delivering a quality road surface.
  • ENH thinks small with new bitumen emulsion plant
    April 23, 2015
    Specialist bitumen plant manufacturer ENH has launched a mini in-line emulsion plant with a capacity of between 2 and 4 tonnes an hour. This contrasts with ENH’s usual size of plant which produces around 50 tonnes an hour. “It’s very mobile which means you can move it around and make the emulsion where you need it,” says ENH managing director Erik Haugaard.
  • ENH thinks small with new bitumen emulsion plant
    January 6, 2017
    Specialist bitumen plant manufacturer ENH has launched a mini in-line emulsion plant with a capacity of between 2 and 4 tonnes an hour. This contrasts with ENH’s usual size of plant which produces around 50 tonnes an hour. “It’s very mobile which means you can move it around and make the emulsion where you need it,” says ENH managing director Erik Haugaard.
  • GPS machine control boosts road surface quality
    February 14, 2012
    The use of GPS machine control on sub-base has improved final rideability on a major highway reconstruction project. Innovative construction techniques have helped to upgrade a 9.6km stretch of the 307km long I-96 highway in the US state of Michigan. The Michigan Department of Transportation (MDOT) project was initiated in the third quarter of 2009 and was completed in the fourth quarter of 2010. Interstate Highway Construction acted as general contractor on the project, which included widening the shoulder