Skip to main content

Removing runway rubber

When Dubai Airport contacted Waterblasting Technologies it faced a number of challenges.
February 20, 2012 Read time: 2 mins
When Dubai Airport contacted Waterblasting Technologies it faced a number of challenges.

One was finding a waterblasting system that would operate successfully in the 42º-52ºC daylight heat of the summer and also to find the fastest and most productive waterblasting system because of very limited runway closure time.

Chemicals, shotblasting and other waterblasting equipment had been tried on the runways, but eventually engineers and management chose the Stripe Hog SH8000T manufactured by 362 Waterblasting Technologies.

The system, which can be built on a variety of truck chassis, uses needle sharp water jets to quickly remove all types of roadway and airfield marking paint as well as runway rubber deposit build-up.

According to the company the Dubai airport runways is probably the most challenging rubber removal environment in the world with an average of 800-plus movements a day with summer-time peaks of 1,100/day and an average of only 5-10 days of rain each year.

"With the ability to remove runway rubber deposits on average of 1,672m²/hour and the ability to operate in the extreme heat without breaking down, the SH8000T became the product of choice for the Dubai airport," says Waterblasting Technologies, which also offers the SH8000T or the new SH8000R with optional, on-board water recycling.

For more information on companies in this article

Related Content

  • Wirtgen: low-emission recycling near Legoland
    March 22, 2024
    Wirtgen, Vögele and Hamm were on a section of the busy E45 highway close to the famous Legoland resort at Billlund, Denmark.
  • Fuel savings from road surfaces
    May 23, 2012
    A new study by civil engineers at MIT shows that using stiffer pavements on America’s roads could reduce vehicle fuel consumption by as much as 3%, that could add up to US$15.6 billion at today’s oil prices. This would result in an accompanying annual decrease in CO2 emissions of 46.5 million tonnes. The study, released in a recent peer-reviewed report, is the first to use mathematical modelling rather than roadway experiments to look at the effect of pavement deflection on vehicle fuel consumption across t
  • Amey chooses polystyrene blocks for Scottish tunnel infill
    June 25, 2018
    Amey recently completed an infill project to make safe a disused railway tunnel underneath the approach roads north of Scotland’s Forth Road Bridge. The 420m tunnel was part of the Dunfermline to North Queensferry railway line that provided a link to the ferry service until the opening of the Forth Bridge in 1890. The 4.3m-wide and 5.1m-high tunnel with vaulted roof and brick lining continued in use for freight until 1954. The tunnel runs underneath the A9000 and B981 on the northern approach to the Forth
  • Italian firms’ more global vision
    February 22, 2013
    At a diminished Asphaltica exhibition, many of Italy’s asphalt sector companies spoke of the importance of overseas markets. Kristina Smith spoke to some of the firms seeking export success. Italy’s 6th Asphaltica show, held in Padua in November last year, provided a snapshot of the challenging economic conditions faced by the country. 2012 was the year when Italy felt the impact of the economic crisis which many other European countries had already suffered. Reflecting this, the exhibition was half the siz