Skip to main content

Volvo CE Pavers working in Montana

Based in Montana, contractor Century Companies is now benefiting from an updated fleet of asphalt paving machines from Volvo CE. The company has operated Volvo CE’s Blaw-Knox pavers for many years and also has two Blaw-Knox PF510s, two PF3200s and a PF410 as well as Volvo DD70, DD118 and DD25B double drum compactors. However it has now added two of the 3m class P7110 tracked machines to its fleet. These were used on a job some 16km from the North Dakota border on the periphery of the Bakken Formation. This
June 23, 2015 Read time: 2 mins
Volvo CE pavers have been used on a key infrastructure job in Montana

Based in Montana, contractor 8155 Century Companies is now benefiting from an updated fleet of asphalt paving machines from 359 Volvo CE.

The company has operated Volvo CE’s Blaw-Knox pavers for many years and also has two Blaw-Knox PF510s, two PF3200s and a PF410 as well as Volvo DD70, DD118 and DD25B double drum compactors.

However it has now added two of the 3m class P7110 tracked machines to its fleet. These were used on a job some 16km from the North Dakota border on the periphery of the Bakken Formation. This area is peppered with more than 6,000 active oil wells and is the largest oil field in the world, meeting 10% of US demand.

With demand increasing, the towns in the area are having to improve infrastructure and Town Pump, a Montana fuel station and convenience store, is building a super truck stop just outside Sidney at the intersection of Montana Highway 16/200.

Century is carrying out one of its largest parking lot paving contracts, laying more than 5,000m2 of asphalt. The crew laid two 70mm compacted base mat layers and a 50mm top layer.

For more information on companies in this article

Related Content

  • Runway rebuild for Detroit airport
    January 25, 2017
    A US contractor has employed equipment from Guntert & Zimmerman to help carry out a runway rebuild at Detroit Metro Airport The busy airport handles around 30 million passengers/year and the project had to be carried out in a tight timeframe as a result, with the paving crew working 16 hours/day to meet the schedule. Ajax Construction has been using its G&Z S850 paver for the work, which was needed as the existing concrete surface on runway 4L/22R had suffered from an alkali silica reaction (ASR). The
  • Atlas Copco Dynapac upgrades large pavers
    March 10, 2016
    Atlas Copco Dynapac says that new features on the large paver range help improve paving quality and productivity, as well as operator comfort. The Dynapac SD2500 and SD2550 paver models now offer increased productivity and better ergonomics, as well as gains in paving process control. The new control features include the TruckAssist and SetAssist systems, as well as an upgraded operator panel with a new display. Jobsite planning, follow-up and paving process optimization is simplified by coupling Atlas Copc
  • Atlas Copco Dynapac upgrades large pavers
    January 6, 2017
    Atlas Copco Dynapac says that new features on the large paver range help improve paving quality and productivity, as well as operator comfort. The Dynapac SD2500 and SD2550 paver models now offer increased productivity and better ergonomics, as well as gains in paving process control. The new control features include the TruckAssist and SetAssist systems, as well as an upgraded operator panel with a new display. Jobsite planning, follow-up and paving process optimization is simplified by coupling Atlas Copc
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public