Skip to main content

Volvo CE Pavers working in Montana

Based in Montana, contractor Century Companies is now benefiting from an updated fleet of asphalt paving machines from Volvo CE. The company has operated Volvo CE’s Blaw-Knox pavers for many years and also has two Blaw-Knox PF510s, two PF3200s and a PF410 as well as Volvo DD70, DD118 and DD25B double drum compactors. However it has now added two of the 3m class P7110 tracked machines to its fleet. These were used on a job some 16km from the North Dakota border on the periphery of the Bakken Formation. This
June 23, 2015 Read time: 2 mins
Volvo CE pavers have been used on a key infrastructure job in Montana

Based in Montana, contractor 8155 Century Companies is now benefiting from an updated fleet of asphalt paving machines from 359 Volvo CE.

The company has operated Volvo CE’s Blaw-Knox pavers for many years and also has two Blaw-Knox PF510s, two PF3200s and a PF410 as well as Volvo DD70, DD118 and DD25B double drum compactors.

However it has now added two of the 3m class P7110 tracked machines to its fleet. These were used on a job some 16km from the North Dakota border on the periphery of the Bakken Formation. This area is peppered with more than 6,000 active oil wells and is the largest oil field in the world, meeting 10% of US demand.

With demand increasing, the towns in the area are having to improve infrastructure and Town Pump, a Montana fuel station and convenience store, is building a super truck stop just outside Sidney at the intersection of Montana Highway 16/200.

Century is carrying out one of its largest parking lot paving contracts, laying more than 5,000m2 of asphalt. The crew laid two 70mm compacted base mat layers and a 50mm top layer.

For more information on companies in this article

Related Content

  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained
  • Caterpillar offers high performance, compact compactors
    January 6, 2017
    Caterpillar claims its new line-up of utility compactors offer a range of key upgrades. The CB22B, CB24B, CB24B XT, CB32B, CB34B, CB34B XW, CC24B and CC34B models are versatile compactors that share technical and performance features and compete in the 1.8-5tonne size range. Efficient compaction is said to be achieved due to better visibility, increased drum diameters, multiple frequency vibratory systems and optional ballast additions on some models. The B-Series compactors are equipped with C1.5 and C2.2
  • Caterpillar offers high performance, compact compactors
    January 28, 2014
    Caterpillar claims its new line-up of utility compactors offer a range of key upgrades. The CB22B, CB24B, CB24B XT, CB32B, CB34B, CB34B XW, CC24B and CC34B models are versatile compactors that share technical and performance features and compete in the 1.8-5tonne size range. Efficient compaction is said to be achieved due to better visibility, increased drum diameters, multiple frequency vibratory systems and optional ballast additions on some models. The B-Series compactors are equipped with C1.5 and C2.2
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S