Skip to main content

Vögele paver meets fine finish requirement

A new generation Vögele SUPER 1303-3i paver has been used to revamp roadways for Germany’s historic Ludwigsburg Palace grounds. The wheeled machine was used to lay coloured asphalt for the entrance area to the palace grounds. The surface quality had to meet tough requirements so as to blend with the historic location. The palace is used for state receptions and cultural events and the extensive grounds are open to the public. A number of pavement rehabilitation measures were recently implemented in the sou
April 1, 2014 Read time: 2 mins
The contractor used the Vögele paver along with Hamm compactors
A new generation 1194 Vögele SUPER 1303-3i paver has been used to revamp roadways for Germany’s historic Ludwigsburg Palace grounds. The wheeled machine was used to lay coloured asphalt for the entrance area to the palace grounds. The surface quality had to meet tough requirements so as to blend with the historic location.

The palace is used for state receptions and cultural events and the extensive grounds are open to the public. A number of pavement rehabilitation measures were recently implemented in the south gardens of the park. These included the redesign of the entrance area and rehabilitation of the footpaths with coloured asphalt.

A manoeuvrable SUPER 1303-3i wheeled compact class paver was selected to carry out the work. Equipped with the latest AB340TV extending screed, the machine suits duties on small urban roads, service roads, combined foot and cycle paths and small to medium-sized areas.
Contractors Gottlob Brodbeck carried out the work under the supervision of site manager Michael Schifer. Foreman Jernail Sing commented, “The most important factor for us in this project was that the screed worked perfectly and ensured maximum evenness. This is crucial as coloured asphalt is a very unforgiving material.”

However, the required evenness of +/- 3mm over a longitudinal distance of 3m was delivered to specification, as was the crown with a 2%.

For more information on companies in this article

Related Content

  • Wirtgen paving technology takes off at Frankfurt
    February 27, 2017
    Time was at a premium for Wirtgen machinery when resurfacing the runway at Frankfurt/Main Airport Europe’s third largest airport, Frankfurt/Main, has new surface course on runways about every seven year, including the centre runway, the most-frequently used section.
  • The “rollercoaster in the dunes”: Circuit Park Zandvoort
    June 14, 2021
    Some projects are so specialist that there are hardly any construction companies with significant experience to draw on - another reason why it is so valuable to have a partner with the expertise and experience to take things forward. The rehabilitation and modification of the race track in Zandvoort was a project like this.
  • Cold recycling helps rebuild of Brazil’s Ayrton Senna highway
    September 28, 2015
    Brazil’s Ayrton Senna Highway has been rebuilt using cold recycling. Brazil’s SP-070 is also known as the Ayrton Senna Highway and is a major highway in the country, carrying heavy traffic volumes. For its rebuild, the time-saving, cost-efficient and eco-friendly benefits of the cold recycling process have been put to the test. The SP-070 provides a key transport link between São Paulo and Campos do Jordão, Vale do Paraíba and Rio de Janeiro, as well as being the main access route to Guarulhos Interna
  • Durable surface solution
    February 22, 2012
    Innovative spray pavers from Vögele have been used in Germany to rehabilitate a section of the A99 autobahn near Munich. In all, four SUPER 1800-2 pavers fitted with SprayJet Module were used to pave a thin, noise-reducing asphalt. overlay on spray seal on the A99 to the west of the Allach Tunnel. For pavement rehabilitation, this stretch of the busy orbital motorway near Munich could only be closed to traffic at night. The traffic volume on the A99 orbital motorway near Munich is 100,000-120,000 vehicles/d