Skip to main content

Paving on Algeria's mega highway

A fleet of 53 Dynapac machines is being used by a Chinese consortium to build the central and western sections of the 1,216km Algerian East-West Expressway. The consortium comprises CITIC and CRCC and was awarded the contract for the 169km central and 359km western sections of highway.
March 1, 2012 Read time: 2 mins
Craig Walker with staff from the Jiangsu Transportation Research Institute (JSTRI) after training on Cooper Technology equipment at the central testing lab in Oran, Algeria
A fleet of 53 206 Dynapac machines is being used by a Chinese consortium to build the central and western sections of the 1,216km Algerian East-West Expressway.

The consortium comprises CITIC and CRCC and was awarded the contract for the 169km central and 359km western sections of highway.

To help meet the tight schedule, tough conditions and remote locations, CITIC-CRCC opted to buy equipment from Dynapac. The new Dynapac fleet comprises 20 F141C pavers; a F182CS paver; 18 CC624HFs and 14 CC622HF tandem rollers. The machines are being used to pave and compact the base course, binder course and wearing course.

French asphalt mixtures and testing procedures have been specified, and the testing laboratories were equipped with large wheel trackers, automatic large roller compactors, trapezoidal bending machines and Duriez testing machines. Among those supplying equipment is UK company 5941 Cooper Technology.

"The French asphalt mixture design method is an advanced, performance-based asphalt mixture design method. French asphalts such as EME2 are expensive due to a bitumen content which is around 1% higher than in conventional mixes, but prove cost effective in terms of life cycle cost analysis," said Mr Jia Yu, Vice Chief Engineer at the Jiangsu Transportation Research Institute in China.

For high modulus asphalt concrete mixture, there are two categories: EME is used in base course and BBME is used in binder and surface course. The two materials are both used in the Algeria East-West Expressway with a wearing course of BBMA.

For more information on companies in this article

Related Content

  • Hailing a Sennebogen 624 E taxi duty cycle crane in France
    October 3, 2018
    Speyser, a family-run company from Bas-Rhin, France, is widely known in eastern France for its expertise in special large-diameter and deep drilling operations. As a long-time user of Sennebogen equipment, the French company invested in the completely new 624 E HD duty cycle crane for work on a site south of Strasbourg. Speyser is drilling large-diameter boreholes in a gravel pit to enable commissioning of the gravel extraction systems on site, explains Christophe Sprauel managing director of Speyser. "Our
  • Chinese quarry increasing size of Caterpillar fleet
    December 10, 2013
    Chinese quarry producer Beijing Xindadi Equipment Company is looking to increase the size of its Caterpillar machine fleet as part of its plan to increase output The company is based at Beijing Miyun Taishi Village and currently produces 1-1.5 million tonnes/year of limestone, which is used for general construction in the Beijing area. Zhang Guofeng is equipment manager for the firm and said, “Business is good because the market is not affected by the downturn.”
  • High efficiency concrete testing is possible with Controls
    March 7, 2018
    Higher accuracy and better repeatability are achievable in concrete testing using the new 250 kN UTM EmS unit from Controls, according to the firm. This advanced universal testing machine benefits from the latest electromechanical servoactuation technology.
  • Race track construction in Japan
    March 13, 2024

    Road construction machines from the Wirtgen Group have been used to build a new race track in Japan. Four Vögele asphalt pavers worked on the project to build a demanding circuit in a mountainous area in Japan.

    Tight corners and uphill gradients of up to 19% are features of the private racing circuit. Three Vögele pavers, a SUPER 1800-3i, a SUPER 1803-3i and a SUPER 1900-2, paved almost 100,000m2 in four layers, while a MT 3000-3i offset material feeder was also used to ensure efficiency and quality.