Skip to main content

Hydrodemolition for repairing airport runways

Hydrodemolition is being used for repairing airport runways, making the process faster and improving quality. According to Aquajet Systems, its high-pressure water jets can be used for the controlled removal or scarification of concrete, as well as the removal of paint and rubber, leaving a fresh surface. The Aqua Cutter hydrodemolition robots are said to be highly efficient when working on concrete runway surfaces. The operator controls the high-pressured ceramic nozzles from a distance, adjusting the s
October 1, 2018 Read time: 2 mins
The Aquajet Rotolance attachment can be paired with a hydrodemolition robot to remove a thin layer of concrete
Hydrodemolition is being used for repairing airport runways, making the process faster and improving quality.

According to 2784 Aquajet Systems, its high-pressure water jets can be used for the controlled removal or scarification of concrete, as well as the removal of paint and rubber, leaving a fresh surface.

The Aqua Cutter hydrodemolition robots are said to be highly efficient when working on concrete runway surfaces. The operator controls the high-pressured ceramic nozzles from a distance, adjusting the stroke to control the depth of cuts and vary the pressure of the water jet. The process allows operators to remove just the top layer of concrete or remove the slab in its entirety. During hydrodemolition, the rebar is cleaned and descaled.

Aside from removing the concrete, Aquajet’s Rotolance attachment is used by maintenance crews to remove paint and rubber from the airstrip. The Rotolance uses its high-pressure water jets to roughen the top layer of concrete to provide a better bonding surface. The tool provides water pressure up to 2,500bar and also removes the rubber left by aircraft tyres.

For more information on companies in this article

Related Content

  • Tuen Mun to Chek Lap Kok Tunnel project
    December 22, 2016
    It is not only the scale of the Tuen Mun to Chek Lap Kok tunnel that impressed delegates but the number of novel technologies that Dragages Hong Kong, a Bouygues Construction subsidiary, is employing on this project. The 4.6 km tunnel running 60m below sea level is part of a strategic new route linking Hong Kong’s airport on Lantau Island and the New Territories. Dragage’s contract includes reclamation of 16.5-hectares at the tunnel’s north end to accommodate the north portal and a ventilation building. Wo
  • Beijing airport runway features novel asphalt solution
    December 7, 2017
    Beijing ranks amongst the five busiest airports across the globe and its runway surfaces face tough stresses as a result. Over 94 million passengers flew through Beijing Capital Airport (BCA) in 2016 and as many as 70 flights/hour can take off and land during peak times. The 60m-wide middle runway of Beijing Capital International Airport is the busiest of the three runways, with a landing and take-off flight ratio of up to 40%. This runway was first rehabilitated in 1996 and then repaired in 2013 and 2015
  • Road recycling developments coming to market
    March 22, 2017
    Major manufacturers are introducing new machines for road milling and recycling that will boost output and lower the cost/m - Mike Woof writes New machines for milling and road recycling will offer increased performance and productivity than earlier generation equipment. Higher quality cutting will help contractors achieve smoother surfaces and considerably lower paving costs also. Meanwhile new recycler/stabiliser machines will offer a better cost/m and improve the economics of road recycling for contra
  • Wirtgen group machines flying high at İstanbul Yeni Havalimanı
    May 21, 2018
    Plant and machines from Wirtgen, Vögele, Hamm and Benninghoven are playing a vital part in the construction of Istanbul’s new airport . Istanbul’s new airport is Turkey’s biggest infrastructure project ever. It is also expected to become the world's largest airport by estimated passenger numbers.