Skip to main content

Geveko’s ChipFill makes its mark

Geveko Markings says that it’s preformed thermoplastic called ChipFill can be used for repairing cracks and smaller holes in surfaces other than asphalt Repairs made with ChipFill can be done in only 20 minutes without the need for bulky machinery, according to the company. All that is needed is a brush and a gas burner. Until now, ChipFill has been used widely for road repair, but it offers easy solutions for other problems as well, such as reseating cobblestones. Thermoplastic and preformed thermoplas
March 28, 2018 Read time: 2 mins
The hot applied thermoplastic ChipFill has a better bonding with underlying asphalt than cold process applications, according to Geveko
Geveko Markings says that it’s preformed thermoplastic called ChipFill can be used for repairing cracks and smaller holes in surfaces other than asphalt


Repairs made with ChipFill can be done in only 20 minutes without the need for bulky machinery, according to the company. All that is needed is a brush and a gas burner.

Until now, ChipFill has been used widely for road repair, but it offers easy solutions for other problems as well, such as reseating cobblestones. Thermoplastic and preformed thermoplastic applied on cobblestones can cause problems as it is prone to crack due to stones shifting. By reseating the cobblestones with ChipFill, markings material such as PreMark, made by US-based company Ennis-Flint, will have their life greatly extended, according to 2447 Geveko.

Surfaces can be levelled by filling the space between cobblestones with ChipFill. This makes the cobblestones both easier and safer to walk on – especially for pedestrians wearing high heels.

ChipFill can secure the area around manhole covers and drain holes. As opposed to cold applied asphalts, the hot applied thermoplastic ChipFill has a better bonding with underlying asphalt. This is because the binders in the thermoplastic bond with the bitumen in the asphalt when heated. As a bonus, Chipfill does not allow water to pass through the material.

ChipFill consists of small chips which makes it extremely easy to work with. Simply pour on the material where needed and sweep up the excess material to save it for later use. This means no waste, but also no mess as you can easily sweep unwanted chips off the surface before applying heat with the gas burner leaving no marks on the actual cobblestones.

For more information on companies in this article

Related Content

  • Polyfunctional Polymeric Systems (PPS) help stressed roads
    May 12, 2016
    Increases in mobility and loads to which roadways are subjected has led, over the past decade, to new technologies for increasing the life of highly stressed pavements. Alongside traditional layers in asphalt concrete with normal or modified binders, there are new technologies which make it possible to produce high performance bituminous layers through the use of polyfunctional polymeric systems (PPSs).
  • Hitachi’s new road scanning technology
    January 11, 2019
    Using advanced vehicle to vehicle communications, this data could be shared between cars and trucks using the same stretch of road. Multiple alerts over road surface issues could also be used to highlight the need for debris removal or road repairs to road authorities.
  • Paving a Japanese airport within strict time constraints
    September 19, 2012
    In Japan, major efforts are being made to both conserve energy and materials, while also delivering high quality airport runways. At Haneda Airport, as well as at the Fukuoka, Chitose and Sendai airports, innovative use is being made of asphalt paving equipment from Sumitomo. The latest model HA60W J paver from Sumitomo is being used to lay warm mix asphalt, while the contractors is also using sophisticated control technology. To minimise disruption to flight schedules, construction work at Haneda has been
  • Naylor drains away waste water concerns
    January 26, 2017
    A bespoke waste water drainage system saved time and money on a recent UK motorway scheme Work on the London’s M25 motorway Junction 30/A13 Corridor Relieving Congestion Scheme is being undertaken by joint venture contractor Balfour Beatty/Skanska. The project is valued at nearly €91 million and completion is for autumn 2016. There has been a successful continual programme of clean-up using road-sweeper/gulley cleaning trucks to remove detritus from the works areas. Disposal of this type of waste w